Inspections for the day of: Wednesday, May 20, 2009.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00164 General Inspection5/20/20095/20/20095/20/2009 5:23:24 PMPPASS
All discharging has completed. Now clean will occur and preparing area for stabilization. Recommended to the RP that hydroseeding would be the best option for stabilizing stream bank. Will re-inspect on 5/26/09 am.
ESC06-01635 Aging Inspection5/20/20095/20/20095/20/2009 3:42:43 PM DONE
ESC06-01635 DOC - Permit Expired5/20/20095/20/20095/20/2009 3:42:38 PMPPASS
ESC06-01638 Aging Inspection5/20/20095/20/20095/20/2009 3:13:40 PM DONE
ESC06-01638 DOC - Permit Finaled5/20/20095/20/20095/20/2009 3:13:06 PMPPASS
ESC09-00242 Site Preparation5/20/20095/20/20095/20/2009 1:32:12 PM PASS
Discussed with RP over how to reach an approved site final on the demo permit. Once complete with stabilizing to contact either I or the city to schedule out a "site final" inspection.
ESC08-00178 Site Final5/20/20095/20/20095/20/2009 1:12:15 PMPFAIL
Message to RP:
Remove D.I> protection at the corner of Bannock and 13th st.
ESC09-00262 Random Inspection5/20/20095/20/20095/20/2009 1:11:15 PMPDONE
Discussed with RP that no more land disturbing activities until the time of recieving there ESC permit and all BMP's are ipmlimented.
ESC09-00050 Site Preparation5/20/20095/20/20095/20/2009 11:36:55 AMAPASS
Site looks good.
ESC09-00248 Site Preparation5/20/20095/20/20095/20/2009 11:13:39 AM PART
Verbal to RP:
Told RP to provide a concrete washout pin (interal or external prior to the pouring of anymore concrete.
ESC09-00251 Site Preparation5/20/20095/20/20095/20/2009 10:54:34 AM PART
Message to home owner:
Need to provide a concrete washout pit prior to pour of concrete. Sign is visable from the street now.
ESC08-00979 BMP Violation5/20/20095/20/20095/20/2009 10:50:11 AMAFAIL
Message to RP:
1. Protect storm drain within parking lot.
2. Contain mortar mixer within the parking lot.
3. Provide a washout for all mortar work that is occuring.
4. Clean all sediment and debris off of all hard surfaces. Will re-inspect on 5/22/09 AM.
ESC08-00952 Random Inspection5/20/20095/20/20095/20/2009 10:34:31 AMAFAIL
Message to RP:
Maintain construction entrance.
Maintain D.I. along Overland Rd.
Provide a proper Concrete Washout Pit.
Will re-inspect on 5/26/09AM.
ESC09-00086 General Inspection5/20/20095/20/20095/20/2009 9:52:04 AMAFAIL
Message with RP:
Not allowed to pour concrete until the time of establishing all permits for the structure with the subdivion.
ESC09-00232 Site Preparation5/20/20095/20/20095/20/2009 9:03:05 AM FAIL
Left message for the applicant (Maria)
CORRECTION NOTICE:
1. Provide a valid RP for the project. (Homeowner RP only applies to the promary residency of the property,not an LLC)
2. Post ESC sign at front of project area where it is visable from the street.
3. Provide storm drain protection at the D.I. on the corner of Malad and Shoshone.
Failure to comply will result in a STOP WORK ORDER. Will re-inspect on 5/21/09 PM.
ESC08-00700 BMP Violation5/19/20095/20/20095/20/2009 8:20:29 AMAPASS
All issues have been corrected.