ELE10-01105
| Electrical Rough-In | 5/20/2010 | 5/20/2010 | 5/20/2010 3:39:28 PM | P | PASS |
|
|
Mitch Phone #: ###-#### ric ok
|
ELE10-01116
| Electrical Rough-In | 5/20/2010 | 5/20/2010 | 5/20/2010 3:01:36 PM | P | CANC |
|
|
Heath Phone #: ###-#### see 5-21-10
|
ELE10-01088
| Final | 5/20/2010 | 5/20/2010 | 5/20/2010 2:56:44 PM | P | CANC |
|
|
Inspection requested from web by: Rhonda Yoast Phone #: ###-#### see 5-21-10
|
ELE10-01113
| Final | 5/20/2010 | 5/20/2010 | 5/20/2010 2:53:49 PM | P | FAIL |
|
|
Emmett Phone #: ###-#### called, NEC 250.24(A) grounded conductor shall be connected to grounding electrode conductor, 230.66 service equipment shall be marked as being suitable for use as service equipment
|
ELE10-00594
| Final | 5/20/2010 | 5/20/2010 | 5/20/2010 2:17:07 PM | P | PASS |
|
|
Inspection requested from web by: Emmet Bushman Phone #: ###-#### ok to final
|
ELE10-01103
| Rough-In Permanent Service | 5/19/2010 | 5/20/2010 | 5/20/2010 1:19:44 PM | P | PASS |
|
|
ok for Id power to reconnect, ###-#### Inspection requested from web by: Randy Fletcher Phone #: ###-#### ric ok, p/s o/h rec ok
|
ELE10-00414
| Final | 5/20/2010 | 5/20/2010 | 5/20/2010 12:47:30 PM | P | PASS |
|
|
Larry Phone #: ###-#### corrections made, ok to final
|
ELE08-01183
| Final | 5/20/2010 | 5/20/2010 | 5/20/2010 12:10:03 PM | P | NH |
|
|
Gabe Phone #: ###-#### called owner, supposed to be note to call when going there, told owner to recall, don't have time to wait for him to come once inspector is on job site
|
ELE10-00778
| Final | 5/20/2010 | 5/20/2010 | 5/20/2010 11:36:38 AM | A | PASS |
|
|
Inspection requested from web by: Rowdy Monroe Phone #: ###-#### ok to final
|
ELE10-00851
| Final | 5/20/2010 | 5/20/2010 | 5/20/2010 10:55:42 AM | A | PASS |
|
|
Inspection requested from web by: Rowdy Monroe Phone #: ###-#### ok to final
|
ELE10-00837
| Final | 5/20/2010 | 5/20/2010 | 5/20/2010 10:33:42 AM | A | PASS |
|
|
Inspection requested from web by: Rowdy Monroe Phone #: ###-#### ok to final
|
ELE10-01108
| Rough-In Permanent Service | 5/19/2010 | 5/20/2010 | 5/20/2010 10:02:33 AM | A | PASS |
|
|
Call Dave @ ###-#### or Kim @ ###-#### when you arrive at the Club House parking lot and they will give you the tour. We replaced the existing old 480 volt 3 phase meterbase, PPP, Flow Meter J-Box, and Well Pump J-Box, added 2 ground rods & bonded to the well casing. Please notify Idaho Power when you are finished so they will energize. Thanks!!! Dan. Inspection requested from web by: Dan Mitchell Phone #: ###-#### ri ok, p/s u/g rec ok
|
ELE09-01409
| Electrical Rough-In | 5/19/2010 | 5/20/2010 | 5/20/2010 9:29:34 AM | A | PASS |
|
|
This is for the 1st floor corridor ceiling inspection, Please contact Jeff for questions. Inspection requested from web by: Mario Puente Phone #: ###-#### ok to cover 1st floor ceilings
|
ELE10-00665
| Final | 5/20/2010 | 5/20/2010 | 5/20/2010 9:18:12 AM | A | CANC |
|
|
Inspection requested from web by: Rowdy Monroe Phone #: ###-#### Inspection cancelled from web by: Rowdy Monroe
|
ELE09-02111
| Electrical Rough-In | 5/20/2010 | 5/20/2010 | 5/20/2010 8:52:15 AM | A | PASS |
|
|
Please Call To Meet in Main Hospital Lobby. ###-#### cell desk Inspection requested from web by: Mark M Phone #: ###-#### walls only ok to cover
|
ELE10-00836
| Final | 5/19/2010 | 5/20/2010 | 5/20/2010 8:21:31 AM | A | PASS |
|
|
Inspection requested from web by: Kristopher Wilson Phone #: ###-#### met contractor, ok to final
|
ELE10-01091
| Temporary Service | 5/19/2010 | 5/20/2010 | 5/20/2010 8:07:00 AM | A | PASS |
|
|
Inspection requested from web by: Zane Robertson Phone #: ###-#### t/s u/g n ok
|