ELE13-01213
| Electrical Rough-In | 5/20/2013 | 5/20/2013 | 5/20/2013 3:02:04 PM | P | PASS |
|
|
Chris Phone #: ###-#### corrections made, ri ok
|
ELE13-01246
| Final | 5/20/2013 | 5/20/2013 | 5/20/2013 2:53:23 PM | P | PASS |
|
|
Robert Phone #: ###-#### ok final
|
ELE11-01478
| Conference | 5/17/2013 | 5/20/2013 | 5/20/2013 2:20:56 PM | P | DONE |
|
|
vance Phone #: ###-#### talked about job progression and ri, timing to come for another inspection
|
ELE13-00960
| Permanent Service | 5/20/2013 | 5/20/2013 | 5/20/2013 2:14:43 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Shaun Kirkman p/s u/g rec ok
|
ELE13-00734
| Conference | 5/20/2013 | 5/20/2013 | 5/20/2013 1:53:14 PM | P | NR |
|
|
I need a later afternoon inspection for the Niche Lighting and to inspect the Potting Compound on the Niche Lighting #8 Ground....I didn''t know what else to put down except Conference, the site doesn''t give many options... Phone #: ###-#### >> Inspection requested via web by JOHN MCCURDY told contractor to call for ri, explained choices, pool contractor added water, shall be pumped out before inspection
|
ELE13-01241
| Rough-In Permanent Service | 5/20/2013 | 5/20/2013 | 5/20/2013 1:21:53 PM | P | PASS |
|
|
call me if you have any questions, Thank You! Phone #: ###-#### >> Inspection requested via web by Julie Schroder ri ok, p/s u/g n ok
|
ELE13-01236
| Rough-In Permanent Service | 5/20/2013 | 5/20/2013 | 5/20/2013 12:58:42 PM | A | PASS |
|
|
Call Dene with any questions Thank you Phone #: ###-#### >> Inspection requested via web by kim grundhauser ri ok, p/s u/g n ok
|
ELE13-00982
| Final | 5/20/2013 | 5/20/2013 | 5/20/2013 12:15:15 PM | P | PASS |
|
|
Terry Phone #: ###-#### ok final, no card on site to sign
|
ESC13-00292
| Site Preparation | 5/20/2013 | 5/20/2013 | 5/20/2013 10:31:16 AM | | PASS |
|
|
looked ok
|
ELE13-01238
| Conference | 5/17/2013 | 5/20/2013 | 5/20/2013 10:25:01 AM | A | DONE |
|
|
Please call ahead for access - aaron Phone #: ###-#### talked about new mast to get out of way for future patio and cover, ok use schedule 80 pvc and fittings
|
ELE13-00736
| Final | 5/18/2013 | 5/20/2013 | 5/20/2013 9:55:36 AM | A | PASS |
|
|
thank you! Phone #: ###-#### >> Inspection requested via web by Adam Staigle ok final, signed card
|
ELE09-01936
| Final | 5/17/2013 | 5/20/2013 | 5/20/2013 9:16:43 AM | A | FAIL |
|
|
Brett-Please call at least 30 mins prior to inpsection Phone #: ###-#### corrections not made, a/c wiring protection, finish make-up basement panel, fix upper switch wire, closet lights, outside back gfci, kitchen gfci, strap furnace wiring, laundry gfci
|
ELE13-00982
| Final | 5/19/2013 | 5/20/2013 | 5/20/2013 8:25:43 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by BARRY KENDALL see p/s
|
ELE13-00982
| Permanent Service | 5/20/2013 | 5/20/2013 | 5/20/2013 8:25:03 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by BARRY KENDALL p/s u/g rec ok, 4 meters required
|