FIR13-00020
| INSP-Conference | 5/20/2013 | 5/20/2013 | 5/20/2013 3:45:21 PM | P | DONE |
|
|
Frank and I discussed the relocation of the electric alarm bells to the nearest point ot the building to the street. Per Potter Electric the bell must be mounted vertical with the weather proof back boxes (per NEC).
|
FIR13-00195
| INSP-Sprinkler Rough-in | 5/20/2013 | 5/20/2013 | 5/20/2013 3:40:58 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
|
FIR12-00693
| INSP-Conference | 5/20/2013 | 5/20/2013 | 5/20/2013 3:37:28 PM | P | DONE |
|
|
Frank and I discussed the relocation of the electric alarm bells to the nearest point ot the building to the street. Per Potter Electric the bell must be mounted vertical with the weather proof back boxes (per NEC).
|
FIR13-00070
| INSP-Final Inspection | 5/20/2013 | 5/20/2013 | 5/20/2013 3:34:20 PM | P | PASS |
|
|
Permit finaled. Forward flush passed.
|
FIR12-00260
| INSP-Final Inspection | 5/20/2013 | 5/20/2013 | 5/20/2013 2:51:45 PM | A | PART |
|
|
Temporary occupancy approved by building official per approval of plan modifications. The applicant has requested a TCO due to the addition not being completed. The estimated completeion date of the addition is within 360 days or sooner per the applicant.
|
BLD12-01449
| FIRE-Final Inspection | 5/20/2013 | 5/20/2013 | 5/20/2013 2:50:37 PM | P | PART |
|
|
Temporary occupancy (life safety) approved by building official per approval of plan modifications. The applicant has requested a TCO due to the addition not being completed. The estimated completeion date of the addition is within 360 days or sooner per the applicant.
|
BLD12-03157
| FIRE-Final Inspection | 5/17/2013 | 5/20/2013 | 5/20/2013 2:02:02 PM | A | FAIL |
|
|
Life safety will be ok to pass when the project related fire alarm permit is finaled.
|
FIR13-00168
| INSP-Final Inspection | 5/17/2013 | 5/20/2013 | 5/20/2013 2:00:06 PM | A | FAIL |
|
|
All devices tested ok but internet tech. is being used for the central station communication. The approved plans indicate two phone lines. Plan reviewer approval is needed for this. A plan modification may be required.
|
BLD13-01192
| FIRE-Final Inspection | 5/17/2013 | 5/20/2013 | 5/20/2013 1:48:32 PM | P | FAIL |
|
|
Provide sticker at the main exit, provide single action hardware for all other doors as per the reviewer comments or get plan review approval for deleting doors.
|
BLD12-01772
| FIRE-Final Inspection | 5/16/2013 | 5/20/2013 | 5/20/2013 10:41:59 AM | A | PART |
|
|
A temporary for the life safety is approved for the east half of the building per letter from Jason.
|