Inspections for the day of: Tuesday, May 20, 2014.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-00191 FIRE-Final Inspection5/20/20145/20/20145/20/2014 4:27:50 PMPPASS
Life safety passed pending fire extinguishers are provided with a current annual certification- To be done prior to structural final as agreed.
FIR14-00124 INSP-Final Inspection5/20/20145/20/20145/20/2014 4:17:21 PMPPASS
Fire sprinkler work passed final walkthrough and inspection. Coverage below elevated tanks approved per R. Gervais.
FIR14-00229 INSP-Final Inspection5/20/20145/20/20145/20/2014 4:02:38 PMPPASS
Remainder of fire alarm testing completed satisfactory. C/N items finished.
BLD14-00370 FIRE-Sprinkler Rough-in5/20/20145/20/20145/20/2014 3:58:07 PMPPART
Okay to cover fire sprinkler system modifications.
FIR14-00293 INSP-Sprinkler Rough-in5/20/20145/20/20145/20/2014 3:57:19 PMPPART
Installation appears acceptable however the piping material and routing has changed from the approved plan.- ( Pipe as installed is sch. 80 PVC, service location is now on the opposite side of the property). Plan modification will be necessary prior to permit final.
BLD14-00725 FIRE-Final Inspection5/19/20145/20/20145/20/2014 11:58:05 AMAPART
Verified EM light, exit sign and light fixture correction items are finished. Final pending project related hood suppression system permit work including functional test/inspection and final. (Hood work underway).
FIR14-00229 INSP-Final Inspection5/20/20145/20/20145/20/2014 11:30:43 AMAPEND
Phone #: ###-#### >> Inspection requested via web by Robert Gobler *Pending fire sprinkler system water supply
BLD14-00292 FIRE-Final Inspection5/19/20145/20/20145/20/2014 11:27:34 AMAPASS
Fire life safety inspection completed satisfactory. Contractor to remove excess building material stacked at the second exit access hallway.
FIR14-00181 INSP-Final Inspection5/20/20145/20/20145/20/2014 11:24:41 AMPPASS
Fire sprinkler work passed final walkthrough. Permit finaled.