BLD14-00361
| BLD-Footing | 5/19/2014 | 5/20/2014 | 5/20/2014 4:46:57 PM | P | NR |
|
|
Dane Phone #: ###-####. rescheduled for am.
|
BLD14-00322
| BLD-Footing | 5/19/2014 | 5/20/2014 | 5/20/2014 4:46:16 PM | P | NR |
|
|
Dane Phone #: ###-####. rescheduled for am.
|
BLD13-03527
| BLD-Footing | 5/20/2014 | 5/20/2014 | 5/20/2014 3:23:45 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin. interior thickend footings.
|
BLD13-03526
| BLD-Footing | 5/20/2014 | 5/20/2014 | 5/20/2014 3:23:24 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin. interior thickend footings.
|
BLD13-03525
| BLD-Footing | 5/20/2014 | 5/20/2014 | 5/20/2014 3:22:58 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin. interior thickend footings.
|
BLD13-03524
| BLD-Footing | 5/20/2014 | 5/20/2014 | 5/20/2014 3:22:33 PM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD13-03524
| BLD-Footing | 5/20/2014 | 5/20/2014 | 5/20/2014 3:22:15 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin. interior thickend footings.
|
BLD14-00457
| BLD-Framing/Rough-in | 5/19/2014 | 5/20/2014 | 5/20/2014 2:25:55 PM | P | PASS |
|
|
Brian Phone #: ###-####. Framing for area 1A ok.
|
BLD12-01135
| BLD-Final | 5/19/2014 | 5/20/2014 | 5/20/2014 2:24:39 PM | P | PASS |
|
|
Charley Cooper Phone #: ###-#### >> Inspection requested via web by Lorrie Ferris
|
BLD12-01135
| DOC - Permit Finaled | 5/20/2014 | 5/20/2014 | 5/20/2014 2:24:27 PM | P | PASS |
|
|
All issues have been resolved.
|
BLD12-01135
| BLD-Blower Door Test Results | 5/20/2014 | 5/20/2014 | 5/20/2014 1:32:22 PM | P | DONE |
|
|
3.6
|
ESC14-00041
| Random Inspection | 5/20/2014 | 5/20/2014 | 5/20/2014 11:29:59 AM | A | PASS |
|
|
|
BLD14-00135
| BLD-Wall Bracing | 5/16/2014 | 5/20/2014 | 5/20/2014 11:29:39 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Paul Thompson
|
BLD14-00135
| BLD-Conference | 5/19/2014 | 5/20/2014 | 5/20/2014 11:28:45 AM | A | DONE |
|
|
Phone #: ###-#### >> Inspection requested via web by Paul Thompson
|
BLD13-01934
| BLD-Final | 5/19/2014 | 5/20/2014 | 5/20/2014 11:28:26 AM | A | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by Paul Thompson. open mech permit. Needs final.
|
BLD13-03532
| BLD-Wall cover | 5/19/2014 | 5/20/2014 | 5/20/2014 11:09:48 AM | A | PASS |
|
|
Firewall assembly Phone #: ###-#### >> Inspection requested via web by Brian Stark. 3rd story ok.
|
BLD13-03533
| BLD-Wall cover | 5/19/2014 | 5/20/2014 | 5/20/2014 11:08:39 AM | A | PASS |
|
|
Firewall assembly Phone #: ###-#### >> Inspection requested via web by Brian Stark. 3rd story ok.
|
BLD13-03534
| BLD-Wall cover | 5/19/2014 | 5/20/2014 | 5/20/2014 11:08:02 AM | A | PASS |
|
|
Firewall assembly Phone #: ###-#### >> Inspection requested via web by Brian Stark. 3rd story ok.
|
BLD13-03535
| BLD-Wall cover | 5/19/2014 | 5/20/2014 | 5/20/2014 11:07:01 AM | A | PASS |
|
|
Firewall assembly Phone #: ###-#### >> Inspection requested via web by Brian Stark. 3rd story ok.
|
ESC13-01217
| General Inspection | 5/20/2014 | 5/20/2014 | 5/20/2014 10:53:34 AM | A | PASS |
|
|
|
BLD13-03360
| BLD-Framing/Rough-in | 5/19/2014 | 5/20/2014 | 5/20/2014 10:53:15 AM | A | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Nail off top chord of 3ply truss in garage as per engineering. Box out electrical ground at 1hr. firewall with 5/8 type x rock.
|
ESC13-01216
| General Inspection | 5/20/2014 | 5/20/2014 | 5/20/2014 10:49:38 AM | A | PASS |
|
|
|
BLD13-03361
| BLD-Framing/Rough-in | 5/19/2014 | 5/20/2014 | 5/20/2014 10:49:07 AM | A | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Install the 12 SDS screws on the T01 3ply as noted on truss engineering. "Box out" the electrical ground at 1hr. firewall with 5/8 type x rock. ok to insulate.
|
ESC13-01214
| General Inspection | 5/20/2014 | 5/20/2014 | 5/20/2014 10:15:31 AM | A | PASS |
|
|
|
BLD13-03363
| BLD-Framing/Rough-in | 5/19/2014 | 5/20/2014 | 5/20/2014 10:15:03 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Needs to provide bearing under 3ply LVL in garage. ok to insulate.
|
ESC13-01218
| General Inspection | 5/20/2014 | 5/20/2014 | 5/20/2014 9:54:52 AM | A | PASS |
|
|
|
BLD13-03359
| BLD-Framing/Rough-in | 5/19/2014 | 5/20/2014 | 5/20/2014 9:54:29 AM | A | FAIL |
|
|
Please call brian prior to inspection Phone #: ###-#### >> Inspection requested via web by Brian Stark. Complete lateral brace on T13 truss, "box out" elctrical ground on 1hr wall with 5/8 type x rock. ok to insulate.
|
MIS14-00108
| BLD-Conference | 5/19/2014 | 5/20/2014 | 5/20/2014 9:16:31 AM | A | FAIL |
|
|
complaint-building & electrical work being done w/o permits. Noted remodel wprk inside of house, removed and relocated walls, electrical work as well. Also noted plumbing work being done at detached accesory structure in backyard. A correction notice was issued to stop work, aplly for all required permits and have work inspected. Also notified electrical and plumbing inspectors.
|