Inspections for the day of: Tuesday, May 20, 2014.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01009 Aging Inspection5/20/20145/20/20145/20/2014 3:17:42 PM PASS
Ongoing.
No ESC Issues at time of inspection
ESC11-00192 General Inspection5/20/20145/20/20145/20/2014 2:53:26 PM PASS
No ESC Issues at time of inspetion
ESC13-00193 General Inspection5/20/20145/20/20145/20/2014 2:40:35 PM PASS
Only ESC Issue;
Site Map shows a catch basin/ditch that runs along the entire south side of new phase from Crestline Rd. to the present catch basin/ditch down along the south side of phase 3 to tie into existing. Called Cameron and left VM disclosing this issue, and gave him till our next inspection (2 Weeks) to address issue (Due to Dry Season) to install this drainage ditch or stop work order will be issued to get back into compliance with their SWPPP Plan.