Inspections for the day of: Wednesday, May 20, 2015.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-03259 FIRE-Conference5/19/20155/20/20155/21/2015 1:40:20 PMAPASS
Discussed fire life safety items with contractor.
BLD14-03318 FIRE-Final Inspection5/19/20155/20/20155/21/2015 11:20:54 AMAPASS
Life safety passed.
FIR15-00227 INSP-Final Inspection5/20/20155/20/20155/20/2015 3:43:35 PMPPASS
Rough-in passed. Piping can be covered.
FIR14-00783 INSP-Sprinkler Rough-in/Hydro5/19/20155/20/20155/20/2015 3:32:18 PMAPASS
The underground hydro from the United Water outlet to the first coupling above the floor is passed.
FIR15-00327 INSP-Final Inspection5/19/20155/20/20155/20/2015 3:27:43 PMACANC
Jed stated he needed to find the plans.
FIR15-00247 INSP-Final Inspection5/20/20155/20/20155/20/2015 2:56:26 PMPCANC
To be rescheduled for next week per contractor
FIR14-00910 INSP-Final Inspection5/19/20155/20/20155/20/2015 2:54:53 PMACANC
Project related fire alarm permit not called in for inspection.
FIR15-00064 INSP-Alarm Testing5/19/20155/20/20155/20/2015 2:05:14 PMACANC
Ken and I agreed to reshedule for tomorrow morning at 7:00am
BLD15-01375 FIRE-Conference5/20/20155/20/20155/20/2015 2:04:01 PMPDONE
The general contractor and I discussed exit signs and emergency light placement. Exit signs need to be placed as shown on the approved plans. I marked one additional exit sign to be added to clarify exiting. Per contractor emergency lighting will be added through-out with the new lighting. I will need emergency lighting in the existing core/elevator lobby
FIR14-00758 INSP-Sprinkler Rough-in5/19/20155/20/20155/20/2015 10:33:33 AMAPASS
Rough-in and tenting inspection passed. Piping can be covered.
BLD15-01038 FIRE-Final Inspection5/19/20155/20/20155/20/2015 9:55:41 AMAPASS
life safety passed
FIR15-00247 INSP-Alarm Testing5/20/20155/20/20155/20/2015 9:23:43 AMAFAIL
No city approved plans on site. However I agreed to due/view a functional test of the two speaker strobes.
FIR15-00002 INSP-Sprinkler Rough-in/Hydro5/19/20155/20/20155/20/2015 8:33:30 AMPFAIL
Inspection today was for the basement and second floor rough-in and hydro tests. Hydro tests failed due to test pump and the need to modify the system. See the city approved plans for location and corrections needed which include overspaced heads, missing branchline restraints, missing flexible cplgs and missing coverage. Ball drip is installed in wrong side of check valve. Plans need to be resubmitted showing the pipin routing changes including riser nipples, additional piping heads and elevation changes.