ESC14-00964
| Aging Inspection | 5/20/2015 | 5/20/2015 | 5/21/2015 2:27:14 PM | | PASS |
|
|
No disturbed area with loose sediment on site. No further construction activity at site. Permit closed.
|
ESC15-00227
| DOC - Permit Finaled | 5/20/2015 | 5/20/2015 | 5/20/2015 5:01:27 PM | P | PASS |
|
|
Construction complete. Homeowner in process of completing landscaping. No sediment leaving site. ESC permit conditions satisfied.
|
ESC14-01119
| General Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 4:23:54 PM | | CANC |
|
|
rescheduled
|
ESC14-01123
| General Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 4:21:19 PM | | CANC |
|
|
rescheduled for 5/21
|
ESC14-00969
| DOC - Permit Finaled | 5/20/2015 | 5/20/2015 | 5/20/2015 4:10:23 PM | P | PASS |
|
|
|
ESC14-00656
| General Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 4:05:38 PM | | CANC |
|
|
|
ESC14-01011
| General Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 4:03:54 PM | P | PASS |
|
|
WIP. Excavation for foundation is complete. No activity currently. Perimeter & downslope wattles are installed and trenched in. No trackout or discharges. Permit sign is posted.
|
ESC14-01035
| General Inspection | 5/19/2015 | 5/20/2015 | 5/20/2015 3:00:39 PM | A | PASS |
|
|
No trackout or sediment leaving site via runoff. Streets and sidewalks are clean. DI in front of house has DI mat to keep sand and sediment out of drain. Permit is posted. No corrections.
|
ESC14-00588
| General Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 2:29:35 PM | P | PASS |
|
|
1:30 PM to discuss and review dewatering plan and CGP permit requirements for monitoring
Two settling ponds are in use. No discharge to Logger's Creek occuring. Plan is to excavate a 3rd retention/infiltration pond to increase settling time. In addition to settling pond, water is to be used for dust control and pumped into a sprinker system along the stockpiles and areas not under construction.
ESI crew is,putting the plan on paper for SWPPP, preparing to initiate the plan, and has read CGP to know monitoring and book keeping requirements.
|
ESC14-00960
| Aging Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 12:04:30 PM | | PASS |
|
|
Construction is complete and home occupied. Lot was not landscaped but has stabilized naturally with weeds and grasses. No sediment leaving. DI bag in front of house to remain as CBH finishes remainging parcels in Trailside Place II
|
ESC14-00960
| DOC - Permit Finaled | 5/20/2015 | 5/20/2015 | 5/20/2015 12:00:08 PM | P | PASS |
|
|
|
ESC14-01124
| General Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 11:39:41 AM | | PASS |
|
|
WIP on interior of SFH. Retaining wall being installed around level portion of parcel. Native hillside vegetation below wall hase been preserved. No trackout to culdesac. Trash container in use, DI bags installed on stormdrains
|
ESC15-00465
| Site Preparation | 5/19/2015 | 5/20/2015 | 5/20/2015 11:27:09 AM | A | PASS |
|
|
Jc Phone #: ###-####
Permit posted. Wattles staked down at edge of pavement at the toe of the gentle slope. DIs have inlet protection. Initial grading and plumbing uitilities are in progress this morning. Approved.
|
ESC14-00277
| Random Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 10:54:10 AM | P | PASS |
|
|
WIP. Permit sign posted. Sidewalk and gutter in front of house do not have trackout or sediment runoff. Lined concrete washout was used for foundation work, and is located on back of lot next to ally. Approved.
|
ESC14-00181
| DOC - Permit Finaled | 5/20/2015 | 5/20/2015 | 5/20/2015 10:48:21 AM | P | PASS |
|
|
Completed home is now landscaped and stabilzed and listed for sale. ESC permit conditons stisfied. Two townhomes in progress adjacent to site by same contractor
|
ESC14-00952
| Aging Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 10:43:28 AM | | PASS |
|
|
Work complete. No loose dirt or disturbed area. No ongoing construction activity or materials onsite, though permit posted in window
|
ESC14-00952
| DOC - Permit Finaled | 5/20/2015 | 5/20/2015 | 5/20/2015 10:42:32 AM | P | PASS |
|
|
|
ESC14-00650
| General Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 10:17:24 AM | | PASS |
|
|
WIP. GC/RP onsite. Interior work and some excavation for stormwater need to be completed. Onsite storm drains have sediment protection and all hillsides are vegetated and have retainings walls. No sediment leaving site. Permit posted.
|
ESC15-00389
| Site Final | 5/19/2015 | 5/20/2015 | 5/20/2015 9:53:18 AM | A | PASS |
|
|
Jeremy from HC Company ###-####
Circular cement pad is complete and DI bags have been removed from storm drains in the vicinity. No materials or loose sediment at site.
HC company to remove yellow sign upon meeting with Boise Parks n Rec this afternooon. ESC conditions satisfied.
|
ESC15-00389
| DOC - Permit Finaled | 5/20/2015 | 5/20/2015 | 5/20/2015 9:51:21 AM | P | PASS |
|
|
|
ESC13-00592
| Conference | 5/19/2015 | 5/20/2015 | 5/20/2015 9:08:06 AM | A | PEND |
|
|
Byion states that K2 agreed to move silt fence. Need to call Melanie with K2 to confirm and request removal
Call made, vm left with K2. Will hear back today and inform Byion of the status.
|
ESC14-00969
| Aging Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 8:55:19 AM | | PASS |
|
|
|
ESC15-00623
| Site Preparation | 5/19/2015 | 5/20/2015 | 5/19/2015 2:11:10 PM | A | PASS |
|
|
John Phone #: ###-####
BMPs installed per ESC plan. Gatorgaurd wattles properly staked and backfilled installed as perimeter sediment control.
Hillside slopes have been previously hydroseeded so preservation of existing vegetation as much as possible will be a BMP.
A new driveway apron will need to be cut so I cautioned RP/GC to contain slurry. DI bags are installed.
Approved. Will start grading and earthwork for retaining walls.
|