BLD15-04501
| BLD-Ceiling Grid Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 5:01:58 PM | P | DEFR |
|
|
Kevin Phone #: ###-#### out of time
|
BLD14-01830
| BLD-Framing/Rough-in | 5/20/2016 | 5/20/2016 | 5/20/2016 5:00:14 PM | P | DEFR |
|
|
Second floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmithout of time
|
BLD15-02772
| BLD-Footing | 5/19/2016 | 5/20/2016 | 5/20/2016 4:55:11 PM | A | PART |
|
|
Tom Phone #: ###-####placed w si
|
BLD16-01239
| BLD-Energy code compliance | 5/19/2016 | 5/20/2016 | 5/20/2016 4:31:58 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Vaughn Pruett
|
BLD16-00285
| BLD-Final | 5/19/2016 | 5/20/2016 | 5/20/2016 3:57:21 PM | P | PASS |
|
|
Bob Phone #: ###-####
|
BLD16-00285
| DOC - Permit Finaled | 5/20/2016 | 5/20/2016 | 5/20/2016 3:57:09 PM | P | PASS |
|
|
|
BLD16-01805
| BLD-Foundation | 5/20/2016 | 5/20/2016 | 5/20/2016 3:42:46 PM | P | PASS |
|
|
Attila Phone #: ###-####
|
BLD15-00516
| BLD-Ceiling Grid Inspection | 5/19/2016 | 5/20/2016 | 5/20/2016 3:29:01 PM | P | FAIL |
|
|
3rd, 4th floor; Keagan Phone #: ###-####
|
BLD16-00921
| BLD-Final | 5/19/2016 | 5/20/2016 | 5/20/2016 3:24:54 PM | P | PART |
|
|
Mike Phone #: ###-#### temp ok pending zonning sign offs no card on site
|
BLD16-00632
| BLD-Framing/Rough-in | 5/20/2016 | 5/20/2016 | 5/20/2016 2:11:41 PM | P | PART |
|
|
Call half before.. says not where the modifications are being made // Larry Phone #: ###-#### need ec revised
|
BLD16-00632
| BLD-Framing/Rough-in | 5/20/2016 | 5/20/2016 | 5/20/2016 2:10:26 PM | P | PASS |
|
|
Larry Phone #: ###-####
|
BLD16-00307
| BLD-Conference | 5/20/2016 | 5/20/2016 | 5/20/2016 1:05:09 PM | P | PART |
|
|
rebar inspection for Wall at 17.8 and T-U line. Troy Gonzales will be the contact. Phone #: ###-#### Inspection requested via web by Troy Gonzales ok pending si aproval
|
BLD15-02502
| BLD-Aging Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 1:04:10 PM | | FAIL |
|
|
|
BLD15-04071
| BLD-Aging Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 1:03:41 PM | | FAIL |
|
|
|
MIS16-00041
| MIS-Aging Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 1:03:27 PM | | CANC |
|
|
|
BLD15-01362
| BLD-Aging Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 1:03:12 PM | | FAIL |
|
|
|
BLD16-00682
| BLD-Framing/Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 11:37:21 AM | A | PART |
|
|
Plans are on site at the fireplace. Call steve with any questions. 850.8424. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson c/n fire blk ok to insulate
|
BLD16-00307
| BLD-Conference | 5/18/2016 | 5/20/2016 | 5/20/2016 10:59:11 AM | A | PASS |
|
|
Rebar inspection for the concrete beams on C-line 17.8 to 24.5-line. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse rated expation joint above grade at north wall need rfi and hourly rating.
|
BLD14-01831
| BLD-Ceiling Grid Inspection | 5/18/2016 | 5/20/2016 | 5/20/2016 10:52:25 AM | P | CANC |
|
|
First floor bathroom ceiling drops Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD14-01987
| BLD-Framing/Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 12:00:00 AM | A | CANC |
|
|
Cancel Per Mike with Levco // would like early as possible; Mike Phone #: ###-####
|