Inspections for the day of: Friday, May 20, 2016.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorChad Schwendiman
TitleMEC-INSPECTOR
Phone #780-9549
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC16-02157 Pressure Test5/20/20165/20/20165/20/2016 2:48:38 PMPPASS
2pmish flue and gas pipe please call Eric ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss - 20lb gas, 5lb flue
MEC16-02133 Final5/18/20165/20/20165/20/2016 2:31:24 PMPNR
Please call installer Aaron when in route to the home at ###-#### Phone #: ###-#### Inspection requested via web by Carolyn Rudd
MEC16-02133 Pressure Test5/20/20165/20/20165/20/2016 2:30:34 PMPPASS
Please call installer Aaron when in route to the home at ###-#### Phone #: ###-#### Inspection requested via web by Carolyn Rudd - 5lb flue pass
MEC16-02170 Final5/20/20165/20/20165/20/2016 1:59:47 PMPNR
Please call Random at ###-#### prior to inspection Phone #: ###-#### Inspection requested via web by Tami Kelly
MEC16-02170 Pressure Test5/20/20165/20/20165/20/2016 1:59:12 PMPCANC
Please call Random at ###-#### prior to inspection Phone #: ###-#### Inspection requested via web by Tami Kelly
MEC16-02191 Rough-in5/20/20165/20/20165/20/2016 1:23:56 PMPPART
inspect gas pipe sleeve in clubhouse Inspection requested via web by william kerwin - okay to cover sleeve for gas piping
MEC15-02759 Rough-in5/19/20165/20/20165/20/2016 1:20:48 PMPCANC
first layer fire wrap insulation duct // Please contact Jim Brown for inspection. Fire Damper inspection for Clearwater Building 2nd Floor and 4th Floor, thanks. Phone #: ###-#### Inspection requested via web by Melissa Kaae
MEC16-01018 Rough-in5/19/20165/20/20165/20/2016 12:02:28 PMAPASS
Flue Piping Phone #: ###-#### Inspection requested via web by Nicholas Paige - flues in walls okay
MEC16-00048 Final5/19/20165/20/20165/20/2016 11:28:56 AMAPART
Chad - 6th floor final and cover for basement Phone #: ###-#### Inspection requested via web by Brandon Sorensen - okay to cover rooms in basement, need to complete protection of nonrated wires in corridoor in the basement. 6th floor okay
MEC16-01711 Rough-in5/19/20165/20/20165/20/2016 10:43:40 AMAPASS
PLease call Daryl with any questions. Phone #: ###-#### Inspection requested via web by Diane Day
MEC16-02140 Final5/19/20165/20/20165/20/2016 10:15:35 AMAPASS
LATE AM PLEASE
INSTALLER: SAM ###-####
THANK YOU Phone #: ###-#### Inspection requested via web by Dustin Rich
MEC16-01595 Final5/19/20165/20/20165/20/2016 9:50:34 AMAPASS
Will be ready first thing in the morning. Please call Bob @ ###-#### prior to inspection Phone #: ###-#### Inspection requested via web by Tami Kelly
MEC16-01595 Pressure Test5/19/20165/20/20165/20/2016 9:50:21 AMAPASS
Will be ready first thing in the morning.Flue pressure test. Please call Bob @ ###-#### prior to inspection Phone #: ###-#### Inspection requested via web by Tami Kelly
MEC16-02007 Rough-in5/19/20165/20/20165/20/2016 9:08:54 AMAFAIL
Rough in - Thank you! Phone #: ###-#### Inspection requested via web by RaChelle Frisbee - Need to group MEC permit to BLD permit. Plans have not been approved for this job yet
MEC15-03033 Mec-Aging Inspection5/20/20165/20/20165/20/2016 9:04:00 AM CANC
MEC14-02880 Mec-Aging Inspection5/20/20165/20/20165/20/2016 9:03:09 AM CANC
MEC15-02230 Mec-Aging Inspection5/20/20165/20/20165/20/2016 9:02:12 AM CANC
MEC16-01253 Final5/19/20165/20/20165/20/2016 9:01:22 AMAPASS
Bj. Early as possible. Trying to do structural as well. Thank You Inspection requested via web by william kerwin
MEC16-01284 Rough-in5/20/20165/20/20165/20/2016 8:34:24 AMAPART
2nd floor rough in. Please look at sleeve in clubhouse slab also. Thanks Chad Inspection requested via web by william kerwin - okay to cover bottom of tgi's on the 2nd floor
MEC16-01290 Rough-in5/19/20165/20/20165/20/2016 8:28:00 AMAFAIL
Re inspection. Approved Manual J is on site. Phone #: ###-#### Inspection requested via web by Rick Montgomery -
1) Need to use b-vent for furnace in uncoditioned space
2) Need 6" fresh air to return air plenum
3) Duct not sized per manual J
4) Need to seal joint on dryer duct
5) Need balance dampers on all supply runs
MEC15-02759 Rough-in5/19/20165/20/20165/20/2016 7:02:02 AMAPART
Please contact Jim Brown for inspection. Cover inspection for Clearwater Building 5th Floor Restrooms, thanks. Phone #: ###-#### Inspection requested via web by Melissa Kaae - Light test pass on 28x18 grease duct, 1st layer fire wrap pass on 50x18 joints, 9th floor core and shell fire/smoke dampers pass, 8th floor core fire/smoke dampers and bathroom ceilings pass, 7th floor core fire/smoke dampers pass, 6th floor north shaft walls okay to cover, 4th floor shaft walls okay to cover on both shafts, 2nd floor south shaft walls okay to cover.