FIR16-00282
| INSP-Sprinkler Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 2:16:38 PM | P | PASS |
|
|
The North half for the first and second floors rough-in passed and the piping can be covered. I also inspected the north half fo the third floor but it did not pass because no tenting had been performed and there are pipe routing changes and additional fittings and added heads that will need to be reviewed prior to a cover inspection being approved.
|
NAF15-00043
| INSP-Final | 5/19/2016 | 5/20/2016 | 5/20/2016 1:47:51 PM | P | PASS |
|
|
Permit finaled
|
BLD16-00159
| FIRE-Final Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 1:47:01 PM | P | PASS |
|
|
Life safety passed
|
FIR16-00304
| INSP-Final Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 12:34:36 PM | P | PASS |
|
|
Permit finaled
|
NAF15-00043
| INSP-Sprinkler Rough-in/Hydro | 5/19/2016 | 5/20/2016 | 5/20/2016 12:16:20 PM | P | PASS |
|
|
Overhead hydro passed
|
FIR16-00303
| INSP-Sprinkler Rough-in/Hydro | 5/19/2016 | 5/20/2016 | 5/20/2016 12:14:27 PM | A | PASS |
|
|
Rough-in passed. Piping can be covered. Per Tim the two heads off of 1" outlet is approved
|
FIR16-00278
| INSP-Final Inspection | 5/19/2016 | 5/20/2016 | 5/20/2016 12:13:37 PM | A | PASS |
|
|
Permit finaled
|
FIR15-00822
| INSP-Sprinkler Rough-in/Hydro | 5/20/2016 | 5/20/2016 | 5/20/2016 10:17:17 AM | P | CANC |
|
|
Mark Jensen is the contact - ###-#### - would like a Hydro test this afternoon. Thank you Phone #: ###-#### >> Inspection requested via web by Kay Haney Inspection cancelled from web by: Stan Beus
|
BLD16-00159
| FIRE-Final Inspection | 5/19/2016 | 5/20/2016 | 5/20/2016 8:23:06 AM | A | FAIL |
|
|
Missing a sprinkler canopy and the ceiling in the closet near the restrooms.
|
FIR16-00226
| INSP-Sprinkler Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 7:55:40 AM | A | PASS |
|
|
Remaining piping can be covered
|