Inspections for the day of: Friday, May 20, 2016.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00806 INSP-Sprinkler Rough-in5/20/20165/20/20165/20/2016 3:34:13 PMPPASS
Rough to cover inspection for tenting of overhead fire sprinkler piping in attic space south of the firedoors complete, approved for cover. This inspection completes rough to cover inspections for this building, all piping approved for cover.
FIR15-00811 INSP-Sprinkler Rough-in5/20/20165/20/20165/20/2016 3:31:22 PMPCANC
Inspection request was for FIR15-00806, this inspection request cancelled and new inspection request generated for correct permit.
FIR16-00027 INSP-Final Inspection5/19/20165/20/20165/20/2016 2:21:11 PMPPASS
Final fire alarm inspection passed/complete
FIR16-00295 INSP-Sprinkler Rough-in5/19/20165/20/20165/20/2016 2:20:38 PMAPASS
Underground hydrostatic test passed/complete.
FIR16-00276 INSP-Sprinkler Rough-in5/19/20165/20/20165/20/2016 11:59:39 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping complete for area of work, all overhead fire sprinkler piping in area of work approved for cover.
FIR15-00561 INSP-Sprinkler Rough-in5/19/20165/20/20165/20/2016 11:57:22 AMAPART
Rough to cover inspection complete for hardlids located in the 4th floor stairwell, notated the city approved drawings with yellow highlighter the lines that were inspected. Area's notated with yellow highlighter approved for cover.
BLD15-04191 FIRE-Final Inspection5/19/20165/20/20165/20/2016 11:54:55 AMAPART
Project being worked in phases, fire sprinkler inspections complete for 5th floor and 6th floor, fire alarm inspections complete for 5th floor and 6th floor, fire extinguishers are in place with current inspections tags for 5th and 6th floors. Final life fire safety inspection for 5th and 6th floors passed/complete. Contractor will schedule life fire safety inspections for remaining floors when ready.
FIR16-00097 INSP-Final Inspection5/19/20165/20/20165/20/2016 11:51:10 AMAPART
Project is being inspected in phases, todays inspection consisted of tamper and waterflow switches for penthouse sprinklers, 6th floor sprinklers and 5th floor sprinklers, all devices operated correctly. Audio/Visual devices tested for 6th floor and 5th floor, all AV's operated correctly. Contractor will schedule inspections for other floors when they are ready.
FIR16-00072 INSP-Final Inspection5/20/20165/20/20165/20/2016 11:46:52 AMPPASS
Final fire sprinkler inspection passed/complete.
FIR16-00033 INSP-Final Inspection5/19/20165/20/20165/20/2016 11:46:07 AMAPASS
Final fire sprinkler inspection passed/complete
FIR16-00060 INSP-Final Inspection5/19/20165/20/20165/20/2016 11:44:57 AMAPASS
Final fire sprinkler inspection passed/complete.