FIR15-00806
| INSP-Sprinkler Rough-in | 5/20/2016 | 5/20/2016 | 5/20/2016 3:34:13 PM | P | PASS |
|
|
Rough to cover inspection for tenting of overhead fire sprinkler piping in attic space south of the firedoors complete, approved for cover. This inspection completes rough to cover inspections for this building, all piping approved for cover.
|
FIR15-00811
| INSP-Sprinkler Rough-in | 5/20/2016 | 5/20/2016 | 5/20/2016 3:31:22 PM | P | CANC |
|
|
Inspection request was for FIR15-00806, this inspection request cancelled and new inspection request generated for correct permit.
|
FIR16-00027
| INSP-Final Inspection | 5/19/2016 | 5/20/2016 | 5/20/2016 2:21:11 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete
|
FIR16-00295
| INSP-Sprinkler Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 2:20:38 PM | A | PASS |
|
|
Underground hydrostatic test passed/complete.
|
FIR16-00276
| INSP-Sprinkler Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 11:59:39 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping complete for area of work, all overhead fire sprinkler piping in area of work approved for cover.
|
FIR15-00561
| INSP-Sprinkler Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 11:57:22 AM | A | PART |
|
|
Rough to cover inspection complete for hardlids located in the 4th floor stairwell, notated the city approved drawings with yellow highlighter the lines that were inspected. Area's notated with yellow highlighter approved for cover.
|
BLD15-04191
| FIRE-Final Inspection | 5/19/2016 | 5/20/2016 | 5/20/2016 11:54:55 AM | A | PART |
|
|
Project being worked in phases, fire sprinkler inspections complete for 5th floor and 6th floor, fire alarm inspections complete for 5th floor and 6th floor, fire extinguishers are in place with current inspections tags for 5th and 6th floors. Final life fire safety inspection for 5th and 6th floors passed/complete. Contractor will schedule life fire safety inspections for remaining floors when ready.
|
FIR16-00097
| INSP-Final Inspection | 5/19/2016 | 5/20/2016 | 5/20/2016 11:51:10 AM | A | PART |
|
|
Project is being inspected in phases, todays inspection consisted of tamper and waterflow switches for penthouse sprinklers, 6th floor sprinklers and 5th floor sprinklers, all devices operated correctly. Audio/Visual devices tested for 6th floor and 5th floor, all AV's operated correctly. Contractor will schedule inspections for other floors when they are ready.
|
FIR16-00072
| INSP-Final Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 11:46:52 AM | P | PASS |
|
|
Final fire sprinkler inspection passed/complete.
|
FIR16-00033
| INSP-Final Inspection | 5/19/2016 | 5/20/2016 | 5/20/2016 11:46:07 AM | A | PASS |
|
|
Final fire sprinkler inspection passed/complete
|
FIR16-00060
| INSP-Final Inspection | 5/19/2016 | 5/20/2016 | 5/20/2016 11:44:57 AM | A | PASS |
|
|
Final fire sprinkler inspection passed/complete.
|