Inspections for the day of: Monday, May 20, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00269 INSP-Sprinkler Rough-in5/20/20195/20/20195/20/2019 4:05:49 PMPPART
Rough in inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping located between conditioned spaces approved for cover, piping requiring tenting to be inspected at a later date. Piping requiring tenting not approved for cover.

Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR18-00690 INSP-Final Inspection5/20/20195/20/20195/20/2019 4:05:01 PMPPASS
Final fire alarm inspection complete.

please have this aft 3:00 pm if possible call joe 30 min prior to inspect ###-#### Phone #: ###-#### Inspection requested via web by Kristin Dolan
FIR19-00233 INSP-Sprinkler Rough-in/Hydro5/20/20195/20/20195/20/2019 2:35:06 PMPDONE
Underground hydrostatic test witnessed, no pressure loss observed.

UNDERGROUND HYDRO Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR19-00263 INSP-Sprinkler Rough-in5/17/20195/20/20195/20/2019 1:55:58 PMPPART
Rough in inspection for Section A Phase 2 complete, notated city approved drawings with yellow highlighter areas approved for cover.

Colton Cox is the contact. This rough-in is for Section A Phase 2, and Colton would like it at 2PM if possible. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD19-01206 FIRE-Final Inspection5/20/20195/20/20195/20/2019 10:45:37 AMPFAIL
Provide fire sprinkler under east overhead door (Any modifications/additions to the fire sprinkler system requires a permit). Exit signs/emergency lights need to be serviced, lights did not stay illuminated when disconnected from AC power.

Drew-please call when on way Phone #: ###-####
FIR19-00242 INSP-Final Inspection5/17/20195/20/20195/20/2019 10:27:28 AMACANC
Cancelled per conversation with point of contact, inspection request was suppose to be for a different day, this request is cancelled at POC request.

Please call Joe prior to coming ###-#### Phone #: ###-#### Inspection requested via web by Kristin Dolan
FIR19-00274 INSP-Sprinkler Rough-in5/20/20195/20/20195/20/2019 9:48:15 AMAPART
Rough in inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping located between conditioned spaces approved for cover, piping requiring tenting to be inspected at a later date. Piping requiring tenting not approved for cover.
FIR19-00274 INSP-Sprinkler Rough-in5/17/20195/20/20195/20/2019 9:46:59 AMAPASS
Rough to cover inspection for underground supply complete, approved for cover.

On Site Contact Heath Day ###-#### Phone #: ###-#### Inspection requested via web by Matt Barnard
FIR19-00274 INSP-Supply line flush5/17/20195/20/20195/20/2019 9:45:07 AMADONE
Underground main line flush complete.

On Site Contact Heath Day at ###-#### Phone #: ###-#### Inspection requested via web by Matt Barnard
BLD18-04006 FIRE-Final Inspection5/17/20195/20/20195/20/2019 8:47:35 AMAFAIL
Provide fire extinguisher with a current inspection tag and mount as discussed. Remove slide bolt locks (2 are currently installed) on rear doors as discussed, slide bolt locks are not approved per IFC code requirements.

Allison Phone #: ###-####