BLD1055953
| INSP - Final | 5/21/1996 | 5/21/1996 | 5/21/1996 12:00:00 AM | | FAIL |
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED f.d. insp needed c/n door clo needed on 1 hr. assembly.
|
BLD95-00601
| INSP - Framing/Rough-in | 5/20/1996 | 5/21/1996 | 5/21/1996 12:00:00 AM | A | NR |
|
|
05/20/96 301 - CONF. REVEIWED REENGINEERING FOR RESOLVE PRIVOUS C/N OK.
|
BLD96-01251
| INSP - Roof | 5/20/1996 | 5/21/1996 | 5/21/1996 12:00:00 AM | A | NR |
|
|
05/20/96 301 - WNS -WORK NOT STARTED
|
BLD96-00573
| INSP - Final | 5/20/1996 | 5/21/1996 | 5/21/1996 12:00:00 AM | P | PASS |
|
|
05/21/96 301 - Between 3:00 - 4:00 p.m. TCO -TEMP C OF O ISSUED occ load sign, ada protection, ref lines support
|
BLD96-00658
| INSP - Footings | 5/21/1996 | 5/21/1996 | 5/21/1996 12:00:00 AM | P | PASS |
|
|
05/21/96 301 - FDN -OK FOUNDATION
|
BLD95-00306
| INSP - Final | 5/20/1996 | 5/21/1996 | 5/21/1996 12:00:00 AM | P | NR |
|
|
05/21/96 301 - Request for inspection between 1-5 p.m. This inspection action on mec95-1700
|