PLM01-01459
| Plumbing Rough-in | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/18/2001 at 11:35:44. Contact: ###-####.
|
PLM01-01582
| Sprinkler (Final) | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-01573
| Water and/or Sewer | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | PASS |
|
|
w/s final dave ###-####
|
PLM01-01584
| Water and/or Sewer | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | PASS |
|
|
Jim ###-#### sewer ok with good bedding 5/21/2001 9:56:52 AM
|
PLM01-01585
| Sprinkler (Final) | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-01589
| Sprinkler (Final) | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | PART |
|
|
located on corner of fed way and s.tk ave in front of jo-ann fabrics on s.side if any questions call Shondee @ ###-#### tie in ok needs a union above grade for maint. 5/21/2001 10:10:19 AM
|
PLM01-01597
| Plumbing Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | FAIL |
|
|
###-#### no connecti 5/21/2001 1:46:38 PM ns are to be made to a closet stub 5/21/2001 1:46:56 PM
|
PLM01-01530
| Groundwork | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PASS |
|
|
greg--208- ###-#### groundwork
|
PLM01-01541
| Water and/or Sewer | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 5/21/2001 2:50:29 PM 1st 60' of 6" test ok
|
PLM00-04403
| Plumbing Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 5/21/2001 3:44:43 PM south vents test ok
|
PLM01-00177
| Water and/or Sewer | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 5/21/2001 3:57:01 PM fromsouth end of 36 to apx 50' south of bldg 24e
|