PLM01-00929
| Final | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 360 On 5/18/2001 5:04:22 PM
|
PLM01-01553
| Plumbing Rough-in | 5/20/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/20/2001 at 21:41:02. Contact: ###-####.
|
PLM01-01601
| Water and/or Sewer | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PASS |
|
|
###-#### w/s at this time do not final rest of fixtures on this permit
|
PLM01-01591
| Plumbing Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 5/21/2001 1:49:29 PM
|
PLM01-01591
| Plumbing Rough-in | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | FAIL |
|
|
JERAMIE ###-#### -- R/I trap arm for master bath tub to long need to re plumb need to hang pex piping every 32- inches 5/21/2001 1:52:32 PM
|