MIS01-00033
| MIS-Aging Inspection | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | | PASS |
|
|
|
BLD01-00563
| BLD-Framing/Rough-in | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | FAIL |
|
|
Ron ###-#### reinspection shear is ok on ext but cn on site for frameing 5/21/2001 10:25:53 AM
|
BLD01-01057
| BLD-Framing/Rough-in | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | NR |
|
|
fr insp ###-####- tony --call 1st before insp
|
BLD01-00173
| BLD-Framing/Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 425 On 5/21/2001 10:28:41 AM shear panels ext ok to cover
|
BLD01-00485
| BLD-Framing/Rough-in | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | A | PASS |
|
|
Kent ###-#### 5/21/2001 11:14:09 AM suspended ceiling gride ok smoke stops ok lighting wired up ok to install panels 5/21/2001 11:20:04 AM
|
MEC01-01412
| Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-00615
| BLD-Framing/Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 425 On 5/21/2001 3:23:18 PM nw sw se corners ok to cover 5/21/2001 3:24:06 PM
|
MEC01-01507
| Final | 5/18/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PASS |
|
|
a/c only jack ###-####
|
BLD01-01139
| BLD-Foundation | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PART |
|
|
bob ###-#### wip 5/21/2001 2:02:55 PM
|
MEC01-00660
| Final | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 08:35:10. Contact: ###-####. code is GBT to get in 5/21/2001 1:00:22 PM
|
BLD01-00911
| BLD-Framing/Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 12:00:00 AM | P | PASS |
|
|
shear wall Todd ###-#### shear nailing ok to cover ext walls 5/21/2001 2:30:09 PM
|