MIS02-00132
| BLD-Conference | 5/20/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | A | FAIL |
|
|
detached garage need approval and bld permit for wall septration/plm ele& p&z said use is to be tempary for office to devlop sub. 5/20/2002 4:02:44 PM 5/20/2002 4:03:46 PM
|
BLD02-00426
| BLD-Footing | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/21/2002 at 06:43:25. Contact: ###-####.placed before inspection no plans on site, 5/21/2002 8:52:05 AM
|
BLD02-00844
| BLD-Framing/Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | A | FAIL |
|
|
1. table 23 nailling schedule nail bottom wall plate to mud sill plate with 16p nails at 16 inches oc.
2. north side of garage door header not supported at king stud and trimer to foundation.
|
BLD01-00967
| BLD-Framing/Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | CANC |
|
|
###-#### pending mech insp. 5/21/2002 2:22:16 PM
|
BLD01-02437
| BLD-Framing/Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | PASS |
|
|
STEVE ###-#### framing ok 5/21/2002 3:01:02 PM
|
BLD02-01006
| BLD-Framing/Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | PART |
|
|
MARK ###-#### need truss engineering and mech insp. ok to insulate. 5/21/2002 2:37:51 PM
|
BLD02-01006
| BLD-Energy code compliance | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | NR |
|
|
MARK ###-####
|
BLD02-00328
| BLD-Energy code compliance | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD02-00844
| BLD-Wall cover | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | PASS |
|
|
sheer ok
|
BLD01-02437
| BLD-Energy code compliance | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | PASS |
|
|
|
BLD00-03428
| BLD-Conference | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | PASS |
|
|
1. (Approved fabricators) Special inspections required by the 1997 UBC are not required where the work is done on the premises of a fabricator registered and approved by the building official to perform such work without special inspection. The approved fabricator shall submit a certificate of compliance that the work was performed in accordance with the approved plans and specifications to the building official and to the engineer or architect of record. (1997 UBC 1701.7)reviewed all submital with superviser to have fabracator SME steel fabracators meet ubc 1701.7 for aproval to discontinue third party insp. engineer of record letter as well as all documents required to meet 1701.7 are on file with the building dept. and aproved.
|