MEC02-01340
| Final | 5/17/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | A | NH |
|
|
###-#### left message on machine...called lyle 5/21/2002 11:15:01 AM
|
MEC02-00946
| Pressure Test | 5/20/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/20/2002 at 08:14:53. Contact: ###-####.... 5/21/2002 9:02:51 AM
|
MEC02-00946
| Final | 5/20/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/20/2002 at 08:15:17. Contact: ###-####. c/n posted..talked to dave 5/21/2002 10:17:09 AM
|
MEC02-01348
| Rough-in | 5/20/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | A | PASS |
|
|
randy ###-#### r/i
|
MEC02-01348
| Pressure Test | 5/20/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | A | FAIL |
|
|
randy ###-#### pres test need to test through meter bar 5/21/2002 12:32:06 PM
|
MEC02-01368
| Final | 5/20/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 05/20/2002 at 17:00:52. Contact: ###-####....3363951 5/21/2002 10:49:22 AM recalled for pm appt with the reverend 5/21/2002 10:57:38 AM
|
MEC02-01365
| Rough-in | 5/20/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/20/2002 at 17:20:59. Contact: ###-####. support flex with metal bands..wrong guage on gas test
5/21/2002 10:16:49 AM
|
MEC02-00953
| Final | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | FAIL |
|
|
sandy- ###-#### fn code for gate is 2684 complete gas to w/h...overflow drains to terminate outside of crawl 5/21/2002 3:35:35 PM
|
MEC02-01368
| Final | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | FAIL |
|
|
meet Reverend at 1:30 posted corrections...called sandy 5/21/2002 2:33:22 PM
|
MEC02-01365
| Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | PASS |
|
|
r/i ###-####- dale re-insp
|
MEC02-01324
| Final | 5/15/2002 | 5/21/2002 | 5/21/2002 12:00:00 AM | P | PASS |
|
|
###-#### \\a\c only
|