Inspections for the day of: Friday, May 21, 2004.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-00912 BLD-Foundation5/20/20045/21/20045/21/2004 12:00:00 AMANR
Scheduled by a contractor via Hello! on 5/20/2004 at 9:03:54 AM. Contact: ###-####.
BLD04-00151 BLD-Final5/20/20045/21/20045/21/2004 12:00:00 AMACANC
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie NR. 5/21/2004 10:45:42 AM
BLD04-00989 BLD-Framing/Rough-in5/20/20045/21/20045/21/2004 12:00:00 AMAPASS
lloyd; Phone #: ###-#### Internet Inspection Request from: Annette Moore Frame and Energy pass. 5/21/2004 1:06:36 PM
BLD03-02759 BLD-Final5/20/20045/21/20045/21/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 5/20/2004 at 2:19:06 PM. Contact: ###-####. C/C issued. 5/21/2004 11:15:45 AM
BLD04-00430 BLD-Final5/20/20045/21/20045/21/2004 12:00:00 AMAPASS
Chuck; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes C/C issued. 5/21/2004 1:07:03 PM
BLD04-00977 BLD-Footing5/20/20045/21/20045/21/2004 12:00:00 AMAPASS
Juan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD03-03065 BLD-Final5/21/20045/21/20045/21/2004 12:00:00 AMANR
Scheduled by a contractor via Hello! on 5/21/2004 at 12:30:02 AM. Contact: ###-####.
BLD04-00729 BLD-Framing/Rough-in5/21/20045/21/20045/21/2004 12:00:00 AMPPART
Fairview...N. on 5mi L. on Glen Ellen fra
ming?? bejsil -- ###-#### home or ###-#### 5/21/2004 1:23:05 PM S_ O_E_ .... Met with owner and gave him some ideas to make the framing system on his roof work.... this is a tough one with minimum plans. told owner to change some framing around and call for Conf. insp......can't fix it all at once. 5/21/2004 2:07:53 PM
BLD04-00151 BLD-Final5/21/20045/21/20045/21/2004 12:00:00 AMPCANC
###-####; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD04-00912 BLD-Foundation5/21/20045/21/20045/21/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 5/21/2004 at 10:47:53 AM. Contact: ###-####.
BLD04-00300 BLD-Footing5/20/20045/21/20045/21/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 5/20/2004 at 2:52:04 PM. Contact: ###-####. Footings for South and West walls pending MTI special inspections, reports and approvals. 5/21/2004 3:45:51 PM