BLD06-02465
| FIRE-Final Inspection | 5/21/2007 | 5/21/2007 | 5/22/2007 8:28:51 AM | P | PASS |
|
|
Final fire life safety inspection passed.
|
FIR07-00269
| INSP-Alarm Testing | 5/18/2007 | 5/21/2007 | 5/21/2007 3:58:48 PM | A | PART |
|
|
Fire alarm work tested satisfactory for the NE quad 1st floor as indicated on approved plans, noted the SD at the stairway exit is not yet programed for stairway pressure fans at this time.
|
BLD07-00352
| FIRE-Final Inspection | 5/17/2007 | 5/21/2007 | 5/21/2007 3:54:45 PM | A | PART |
|
|
Fire life safety is acceptable for the NE portion of the 1st floor remodel area.
|
FIR06-00800
| INSP-Sprinkler Rough-in/Hydro | 5/21/2007 | 5/21/2007 | 5/21/2007 3:20:18 PM | P | PART |
|
|
OH hydro for the dry system and the retest of the 3rd and 6th floor wet systems tests passed inspection.
|
FIR06-00800
| INSP-Sprinkler Rough-in/Hydro | 5/21/2007 | 5/21/2007 | 5/21/2007 3:17:15 PM | P | FAIL |
|
|
The second same day visit for fire pump testing is not ready for inspection due to leakage at the pump gasket and packing (allowed 25 minutes for contractor to make the necessary repairs which could not be completed while on site), incorrect pump motor rotation, jockey pump rotation not yet verified, concentric and eccentric reducers are installed at the incorrect locations, all sensing line piping shall be non-corrosive, it shall be the contractors responsibility to pre-test the system and it's components prior to scheduling acceptance testing per requirements of NFPA 20.
|
BLD06-02785
| FIRE-Final Inspection | 5/21/2007 | 5/21/2007 | 5/21/2007 1:57:31 PM | P | PASS |
|
|
Shell life safety passed.
|
FIR06-00800
| INSP-Sprinkler Rough-in | 5/17/2007 | 5/21/2007 | 5/21/2007 1:39:18 PM | A | FAIL |
|
|
We are having a pump start up at 8:00am. This is to schedule the start up so you can be there to witness. Mike B is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus...........................Contractor replacing a leaking gasket at the pump, noted installation not ready for inspection at the time of requested site visit.
|
FIR07-00034
| INSP-Sprinkler Rough-in/Hydro | 5/18/2007 | 5/21/2007 | 5/21/2007 1:30:33 PM | A | PART |
|
|
1st floor overhead hydrostatic test passed.
|
FIR06-00887
| FIR-Aging Inspection | 5/21/2007 | 5/21/2007 | 5/21/2007 12:43:56 PM | | DONE |
|
|
Work in progress.
|
FIR07-00131
| INSP-Final Inspection | 5/18/2007 | 5/21/2007 | 5/21/2007 11:58:27 AM | A | PASS |
|
|
Fire sprinkler permit work is approved for final, noted signage at the backflow to be installed as discussed and verified at BLD final.
|
FIR06-00645
| INSP-Final Inspection | 5/18/2007 | 5/21/2007 | 5/21/2007 11:32:07 AM | A | DEFR |
|
|
Inspection to be rescheduled.
|
FIR07-00342
| INSP-Sprinkler Rough-in | 5/18/2007 | 5/21/2007 | 5/21/2007 11:24:05 AM | A | FAIL |
|
|
One room exceeds ordinary hazard group 2 spacing, ceilings are not completed in two rooms, all remaing drop ceiling areas are okay for cover, noted on plans.
|
BLD06-02665
| FIRE-Final Inspection | 5/18/2007 | 5/21/2007 | 5/21/2007 10:49:08 AM | A | PASS |
|
|
Required corrections have been made, fire life safety inspection passed.
|
FIR06-01002
| INSP-Final Inspection | 5/21/2007 | 5/21/2007 | 5/21/2007 10:47:11 AM | P | PASS |
|
|
Corrections verified, fire sprinkler permit finaled.
|