ESC07-01561
| Random Inspection | 5/21/2008 | 5/21/2008 | 5/21/2008 3:11:15 PM | P | PART |
|
|
Verbal: maintance on construction entrance, and other bmps. Hydroseed stockpile soils on property at rear of project.
|
ESC08-00233
| Random Inspection | 5/21/2008 | 5/21/2008 | 5/21/2008 3:10:01 PM | P | PART |
|
|
Need to provide top dressing on consruction entrance, maintance needed on a few bmp's. Stockpile soils at rear of project needs final grading and hydroseeding, (long term).
|
ESC07-01541
| BMP Violation | 5/21/2008 | 5/21/2008 | 5/21/2008 3:02:31 PM | P | FAIL |
|
|
Verbal to contractor/rp: Need to use concrete washout pit. Remove surface concrete residual and place in pit. Also, take necessary measures to reduce trackout along Apple. Will follow up.
|