Inspections for the day of: Wednesday, May 21, 2008.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-01486 Aging Inspection5/21/20085/21/20085/22/2008 3:31:26 PM CANC
Moved to a site final.
CAS
#460
ESC05-01489 Aging Inspection5/21/20085/21/20085/22/2008 3:31:01 PM DEFR
Moved to a site final.
CAS
#460
ESC05-01485 Aging Inspection5/21/20085/21/20085/22/2008 3:30:38 PM DEFR
Moved to a site final.
CAS
#460
ESC05-01484 Aging Inspection5/21/20085/21/20085/22/2008 3:30:14 PM DEFR
Moved to a site final.
CAS
#460
ESC05-01487 Aging Inspection5/21/20085/21/20085/22/2008 3:29:50 PM DEFR
Moved to a site final.
CAS
#460
ESC08-00073 Random Inspection5/21/20085/21/20085/21/2008 4:26:35 PMPFAIL
Need to clean up dirt of of the sidewalksand get some sediment control at the front of the lot where it has been removed.
CAS
#460
ESC08-00155 Site Preparation5/16/20085/21/20085/21/2008 3:58:05 PMPPART
Need to install D. I. protection on the drain on Liberty.
CAS
#460
ESC08-00342 Site Preparation5/16/20085/21/20085/21/2008 1:27:50 PMAPART
Just starting to put in the construction entrance once they are complete with the moving of sand pile. Sign posted at front of lot.
CAS
#460
ESC07-01067 BMP Violation5/20/20085/21/20085/21/2008 1:07:15 PMACANC
Sheet rock pile is still is present. Notified RP and will re-inspect at the end of the day.
CAS
#460
ESC08-00202 Tracking Control5/20/20085/21/20085/21/2008 11:17:36 AMAFAIL
Notice of Correction
1. Remove all material off of the right away. (no permit with ACHD)
2. Clean up tracking coming off of project.
Left notice with the project super. Will re-inspect on 5/22/08
CAS
#460
ESC08-00239 Site Preparation5/16/20085/21/20085/21/2008 10:43:58 AMPPART
All work is inerior. But sign needs to be re-posted at front of building.
CAS
#460
ESC07-01547 BMP Violation5/21/20085/21/20085/21/2008 10:02:18 AMAFAIL
Notice of Correction
1. Install secondary protection on field D.I. correctly.
2. Re-install silt fence per manufactures specs.
3. Provide access control on project perimeter.
4. Install D.I . protection at drain on Five Mile.
5. Clean up tracking onto Five mile road
Failure to comply with notice by Friday the 23rd will result in a stop work order.
CAS
#460
ESC07-00070 Random Inspection5/20/20085/21/20085/21/2008 9:48:51 AMAFAIL
Trash is still an ongoing issue. needed to be put into the container. Pick-up and remove the petroleum lubercates from the the back of lot. And repair silt fence.
Spoke with RP gave him till Friday to correct the issues. Will re-inspect on Friday the 5/23/08
CAS
#460