Inspections for the day of: Thursday, May 21, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-01639 Aging Inspection5/21/20095/21/20095/21/2009 3:48:31 PM DONE
ESC06-01639 DOC - Permit Finaled5/21/20095/21/20095/21/2009 3:48:24 PMPPASS
ESC07-00070 BMP Violation5/21/20095/21/20095/21/2009 3:48:16 PMPPART
Stop work order pulled. Began to re-stabilize the gully that formed on the north east hillside. Will be completed tomorrow after they apply a hydro seed mix w/ tachifier. Will re-inspect 5/22/09 PM.
ESC08-00585 General Inspection5/21/20095/21/20095/21/2009 3:18:13 PM PASS
ESC07-00252 DOC - Permit Finaled5/21/20095/21/20095/21/2009 12:50:59 PMPPASS
ESC06-00254 DOC - Permit Finaled5/21/20095/21/20095/21/2009 12:50:12 PMPPASS
ESC09-00255 Site Preparation5/21/20095/21/20095/21/2009 10:30:24 AM PART
Verbal to home owner:
1. provide storm drain inlet protection at the drain inlet inforn of property.
ESC08-01050 Random Inspection5/21/20095/21/20095/21/2009 10:07:32 AMAPASS
ESC03-01234 DOC - Permit Finaled5/21/20095/21/20095/21/2009 10:05:10 AMPPASS
ESC03-01460 DOC - Permit Finaled5/21/20095/21/20095/21/2009 10:04:35 AMPPASS
ESC04-01096 DOC - Permit Finaled5/21/20095/21/20095/21/2009 10:04:09 AMPPASS
ESC09-00278 Site Preparation5/21/20095/21/20095/21/2009 10:03:55 AMAPASS
ESC09-00035 Random Inspection5/21/20095/21/20095/21/2009 9:36:41 AMPPASS
Graded out the dewatering channel and removed most of the stockpile through out project area.
ESC08-00924 General Inspection5/21/20095/21/20095/21/2009 9:35:33 AMAFAIL
Verbal to RP:
1. Clean up all trash debris generated from project.
2. Re-post ESC sign.

Also was told that Knife River will taking the responsibility for the basin area. Told RP to send a Letter to Steve Webb to show that change of responsibility.
ESC09-00232 BMP Violation5/20/20095/21/20095/20/2009 4:05:33 PMPPART
Told RP that they need to provide a washout pit prior to any concrete being poured on project area. Will re-inspect on 5/26/09 Pm