FIR13-00217
| INSP-Final Inspection | 5/17/2013 | 5/20/2013 | | A | |
|
|
Alex Phone #: ###-####
|
FIR13-00148
| INSP-Sprinkler Rough-in | 5/20/2013 | 5/21/2013 | 5/21/2013 4:34:05 PM | P | PART |
|
|
ADA rooms north side floors 3,4,5, and 6 okayed for ceiling cover. Rough-in passed.
|
FIR13-00189
| INSP-Final Inspection | 5/20/2013 | 5/21/2013 | 5/21/2013 4:31:57 PM | A | PASS |
|
|
Fire sprinkler permit final approved.
|
FIR13-00118
| INSP-Final Inspection | 5/20/2013 | 5/21/2013 | 5/21/2013 4:30:37 PM | A | PASS |
|
|
Fire sprinkler permit finaled, inspection passed.
|
BLD13-00804
| FIRE-Final Inspection | 5/20/2013 | 5/21/2013 | 5/21/2013 1:11:30 PM | A | PASS |
|
|
Fire life safety completed acceptable. Fire extinguisher to be located as discussed.
|
FIR13-00188
| INSP-Final Inspection | 5/20/2013 | 5/21/2013 | 5/21/2013 1:09:54 PM | A | PASS |
|
|
Fire sprinkler work passed final walkthrough. Permit finaled.
|