FIR14-00792
| INSP-Sprinkler Rough-in | 5/21/2015 | 5/21/2015 | 5/21/2015 2:42:59 PM | P | PART |
|
|
Rough in inspection of Bldg. H -basement hard lid areas.
|
FIR14-00735
| INSP-Sprinkler Rough-in/Hydro | 5/21/2015 | 5/21/2015 | 5/21/2015 2:40:54 PM | P | PASS |
|
|
Bldg. D dry pipe system hydrotest - 200psi @ 2 hours - Passed
|
FIR14-00681
| INSP-Sprinkler Rough-in/Hydro | 5/21/2015 | 5/21/2015 | 5/21/2015 2:39:42 PM | P | PASS |
|
|
Hydrotest Wing D and commons. 200psi @ hours - Passed
|
FIR14-00604
| INSP-Sprinkler Rough-in/Hydro | 5/21/2015 | 5/21/2015 | 5/21/2015 2:38:20 PM | P | PASS |
|
|
Dry pipe system hydrotest - Passed
|
FIR14-00344
| INSP-Sprinkler Rough-in/Hydro | 5/21/2015 | 5/21/2015 | 5/21/2015 2:36:57 PM | P | PASS |
|
|
Hydrotest - 200 psi @ 2hours - Passed
|
FIR14-00531
| INSP-Sprinkler Rough-in | 5/20/2015 | 5/21/2015 | 5/21/2015 11:56:54 AM | A | PART |
|
|
Rough-in inspection of 1sr floor hard lids near stair #1. Also stair 1 levels 3 and 4, and 4th floor POD area.
|
FIR14-00252
| INSP-Sprinkler Rough-in/Hydro | 5/20/2015 | 5/21/2015 | 5/21/2015 11:54:12 AM | A | PART |
|
|
Hydrotest of 2nd floor kitchen and lobby area - Passed. First floor system had leak so that one will be retested at a later date.
|
FIR14-00866
| INSP-Sprinkler Rough-in | 5/20/2015 | 5/21/2015 | 5/21/2015 12:00:00 AM | A | CANC |
|
|
Wrong permit number requested.
|