PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, May 21, 2015
.
Number of inspections:
18
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC14-01060
General Inspection
5/21/2015
5/21/2015
5/21/2015 4:48:30 PM
CANC
rescheduled for 5/22
ESC15-00578
Site Preparation
5/21/2015
5/21/2015
5/21/2015 3:54:02 PM
P
PASS
Clint Phone #: ###-####
Permit posted. Tahoe Homes projects in East Valley are in compliance. No sediment runoff occuring. BMPs installed.
Approved.
ESC14-01128
General Inspection
5/21/2015
5/21/2015
5/21/2015 3:27:55 PM
PASS
WIP on hangar, runway to hangar, stormwater retention ponds. No trackout to Gowen. No fugitive dust issues. Site work staying within limits of disturbance. No corrections.
ESC14-01123
General Inspection
5/20/2015
5/21/2015
5/21/2015 3:06:43 PM
A
PASS
WIP. Permit posted. No significant trackout. No violations observed. Workers parking on street to avoid trackout. Site is within an industrial area formerly a gravel pit.
ESC14-00432
General Inspection
5/21/2015
5/21/2015
5/21/2015 2:36:00 PM
PASS
No activity at Aralar Park in recent weeks. DI on Lizaso has had inlet bags removed since areas are stabilzed.
No changes to silt fence. Sediment bags installed on inlets need to be maintained after the recent storms. No turbid discharges or issues around 5 mile Creek
ESC14-00964
DOC - Permit Finaled
5/21/2015
5/21/2015
5/21/2015 2:24:39 PM
P
PASS
ESC14-01131
General Inspection
5/21/2015
5/21/2015
5/21/2015 1:58:47 PM
PASS
ESC15-00554
Site Preparation
5/21/2015
5/21/2015
5/21/2015 12:41:20 PM
P
PART
###-#### Inspection requested via web by Erby Gonzales
Ready for excavation. Permit sign is posted on back of Brighton sign.
Correction:
Empty out and reinstall DI bag on Sawmill and Woodcarver by end of week. It is full
Correction issued to Erbie who was onsite in Mill District Square
ESC15-00405
Site Preparation
5/21/2015
5/21/2015
5/21/2015 12:37:32 PM
P
PASS
###-#### Inspection requested via web by Erby Gonzales
ESC15-00457
Site Preparation
5/21/2015
5/21/2015
5/21/2015 12:36:46 PM
P
PASS
###-#### Inspection requested via web by Erby Gonzales
Permit sign posted. WIP per notice with Erbie. Dumptruck moving some dirt around RH #6 so will need to sweep up trackout once the operation is complete. DI bags and washout installed.
ESC15-00517
Site Preparation
5/21/2015
5/21/2015
5/21/2015 12:35:00 PM
P
PASS
###-#### Inspection requested via web by Erby Gonzales
Mill District Square BMPs in good condition. Multiple SFHs in progress. Cement washout is lined and has remaining capacity.
ESC14-00588
General Inspection
5/21/2015
5/21/2015
5/21/2015 12:04:36 PM
P
PASS
Dewatering has been post poned to allow ponds to infiltrate/drain so they can been lined and improved. Water is too murky & turbid to discharge. Water truck is pumping water out of the pond to use for fugitive dust control.
ESI will contact next week when proper setup is constructed. Approved.
ESC13-00655
General Inspection
5/21/2015
5/21/2015
5/21/2015 11:07:30 AM
PASS
Phase I in Aberdeen Square has all construction finished and all disturbed areas stabilized. Streets are free of loose dirt from construction activity in Phase II.
Phase II on the north side of Colehaven is in progress with vertical and foundation work in progress. Some trackout and stockpiles on hard surfaces at time of inspection. Crews were backifilling foundations and hauling away dirt. All DIs (MS4 on Raymond & private) have sediment capture bags.
No dust, windblown trashout, or trackout of mud. Just need to sweep sidewalks on Raymond when finished backfilling.
ESC14-01024
Aging Inspection
5/21/2015
5/21/2015
5/21/2015 10:08:48 AM
PASS
ESC13-01247
General Inspection
5/21/2015
5/21/2015
5/21/2015 9:47:37 AM
PASS
ESC14-01084
Aging Inspection
5/21/2015
5/21/2015
5/21/2015 9:17:30 AM
PASS
Home complete. ESC permit conditions satisfied.
ESC14-01084
DOC - Permit Finaled
5/21/2015
5/21/2015
5/21/2015 9:16:46 AM
P
PASS
ESC14-01119
General Inspection
5/20/2015
5/21/2015
5/21/2015 8:45:58 AM
A
PASS