FIR15-00208
| INSP-Sprinkler Rough-in | 5/20/2015 | 5/21/2015 | 5/21/2015 12:00:00 AM | A | PART |
|
|
Partial Rough in inspection; 2nd floor only. 1st floor not ready. Correction items at 2nd floor include:
1) Missing 1 inch outlet in North mechanical room;
2) Sky light areas show 4 SSP's on plans, however, only 3 SSP's installed per area;
3) South/East floor area missing SSU protection between Beam and new interior room;
4) Unprotected combustible spaces between south windows and newly constructed soffit along entire building South wall. To be verified with plans examiner;
5) 200 degree temp SSP's mixed with 165 temp SSP's within same compartment throughout 2nd floor.
|