ELE20-01729
| Final | 5/20/2020 | 5/21/2020 | 5/21/2020 2:34:28 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Same Electric... 1) no access to do inspection 2) scope of work does not match building permit scope of work in basement
|
ELE20-01718
| Electrical Rough-In | 5/20/2020 | 5/21/2020 | 5/21/2020 2:00:42 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Craig Korell... rough ok to cover open walls wired where required...kitchen, dine,mud room, and living rm
|
ELE20-01178
| Electrical Rough-In | 5/21/2020 | 5/21/2020 | 5/21/2020 1:28:59 PM | P | PASS |
|
|
Ceiling Inspection, Chad Vanorden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce.. grid ok to cover
|
ELE20-01180
| Final | 5/21/2020 | 5/21/2020 | 5/21/2020 1:16:46 PM | P | PASS |
|
|
Chad Vanorden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...ok to final...card signed
|
ELE20-01180
| Electrical Rough-In | 5/21/2020 | 5/21/2020 | 5/21/2020 1:16:15 PM | P | PASS |
|
|
ceiling grid...ok to cover
|
ELE20-01025
| Electrical Rough-In | 5/21/2020 | 5/21/2020 | 5/21/2020 12:35:26 PM | P | PASS |
|
|
We need a ceiling cover inspection, Tobias is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker... ceiling ok
|
ELE20-01735
| Conference | 5/21/2020 | 5/21/2020 | 5/21/2020 12:07:07 PM | P | PASS |
|
|
*screened* Michael Phone #: ###-####.. discussed requirements for temp service for construction of new addition...competent in work...works for Quality Electric
|
ELE20-01730
| Final | 5/21/2020 | 5/21/2020 | 5/21/2020 10:59:17 AM | P | PASS |
|
|
Screened- Robert Phone #: ###-####... new 15A 240V circuit...disconnect and GFCI receptacle...ok to final
|
ELE20-01691
| Final | 5/21/2020 | 5/21/2020 | 5/21/2020 10:31:12 AM | P | PASS |
|
|
Screened- Robert Phone #: ###-####... power restored...ok to final
|
ELE20-01269
| Final | 5/20/2020 | 5/21/2020 | 5/21/2020 10:17:28 AM | A | PASS |
|
|
See scope of work on original permit Phone #: ###-#### Inspection requested via web by Anne Weadick...retro fixtures to LED...spec sheets emailed...ok to final
|
ELE20-00626
| Final | 5/20/2020 | 5/21/2020 | 5/21/2020 9:48:40 AM | A | PART |
|
|
This is only a partial final for the West half of the building so the tenant can relocate and we can start Phase-3 of the remodel. Please call if you have any questions, thank you Phone #: ###-#### Inspection requested via web by Brad Hoots... partial final Phase1 of building...offices, front entry and main north room
|
ELE19-04099
| Electrical Rough-In | 5/20/2020 | 5/21/2020 | 5/21/2020 9:26:16 AM | A | PASS |
|
|
rough in for 1st, 2nd and 3rd floor (12 units). Phone #: ###-#### Inspection requested via web by Todd Hall...shear wall ok to cover-12 units so can set bath tub
|
ELE19-03758
| Electrical Rough-In | 5/20/2020 | 5/21/2020 | 5/21/2020 9:24:33 AM | A | PASS |
|
|
ceiling drops 3rd and 4th floor Phone #: ###-#### Inspection requested via web by Todd Hall... drops ok to cover
|
ELE20-01401
| Final | 5/20/2020 | 5/21/2020 | 5/21/2020 8:11:51 AM | A | PASS |
|
|
ESW foreman, Dustin to meet Tom Sanders on site at 8:00. Tom is aware of the Final Inspection. Thank you Phone #: ###-#### Inspection requested via web by Paula Gratiot... images of rough were taken and shown...junctions made accessible to move power...ok to final
|