BLD01-00248
| BLD-Final | 5/22/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | | FAIL |
|
|
need all other insp. ele mech plm/ need mis check list.
|
BLD01-00031
| BLD-Aging Inspection | 5/22/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | | PASS |
|
|
|
BLD01-00312
| BLD-Aging Inspection | 5/22/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | | FAIL |
|
|
dick with bargreens to have all insp. sign off on occ. card with in 2 wk time line. 5/24/2001 9:18:28 AM
|
BLD01-00248
| BLD-Final | 5/21/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | A | FAIL |
|
|
Jeff ###-#### need mis form from housing insp. / need all other insp. ele.plm.mec 5/22/2001 11:43:54 AM
|
BLD01-01106
| BLD-Footing | 5/21/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 13:43:23. Contact: ###-####.
|
BLD01-01105
| BLD-Footing | 5/21/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 13:44:38. Contact: ###-####.
|
BLD01-00847
| BLD-Framing/Rough-in | 5/21/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | A | PASS |
|
|
###-#### 5/22/2001 11:42:15 AM 5/22/2001 11:42:50 AM
|
BLD01-01030
| BLD-Final | 5/21/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 17:21:52. Contact: ###-####. need mis permit for sign off/ need owner to contat george slane to maintane stair door protection. 5/22/2001 11:41:40 AM
|
BLD01-00252
| BLD-Framing/Rough-in | 5/22/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | P | PART |
|
|
Perry ###-#### mech to do rough in after will need access talked to lightfoot ok/ main floor ok for cover / back stair head height check with slane. 5/22/2001 4:12:31 PM
|
BLD01-00383
| BLD-Framing/Rough-in | 5/22/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/22/2001 at 08:36:20. Contact: ###-####.
|
BLD00-02175
| BLD-Final | 5/22/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | P | FAIL |
|
|
###-#### handrail and occ signage/ panic hardware to lobby pending fire sign off. 5/22/2001 4:14:08 PM
|
BLD01-00385
| BLD-Framing/Rough-in | 5/22/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/22/2001 at 10:59:21. Contact: ###-####.
|
BLD01-00383
| BLD-Energy code compliance | 5/22/2001 | 5/22/2001 | 5/22/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 301 On 5/22/2001 4:28:19 PM
|