ELE02-01258
| Final | 5/21/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | A | PASS |
|
|
susie ###-#### for sign for tj max & more store
ok had no access too soffit behind the sign 5/22/2002 11:53:09 AM
|
ELE02-00774
| Final | 5/21/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/21/2002 at 15:33:18. Contact: ###-####. ok 5/22/2002 10:39:40 AM
|
ELE02-01524
| Electrical Rough-In | 5/21/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | A | PASS |
|
|
POOL BONDING CHAD ###-#### encapsulation ok&bonding ok 5/22/2002 11:05:05 AM
|
ELE02-01514
| Final | 5/21/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | A | PASS |
|
|
fn gary ###-#### 200.6 ,210.8,300.10
corr.posted cont. called
5/22/2002 11:33:55 AM
|
ELE02-01267
| Final | 5/21/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/21/2002 at 16:34:10. Contact: ###-####. ok 5/22/2002 12:11:14 PM
|
ELE02-01514
| Final | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | A | FAIL |
|
|
cor. posted called see passed inspection request for details passed it should of been failed
|
ELE02-01533
| Electrical Rough-In | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PASS |
|
|
###-#### upstairs and downstairs ok for r/i 5/22/2002 3:33:53 PM
|
ELE02-00816
| Permanent Service | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PASS |
|
|
p/s u/g rec. ok
|
ELE02-00816
| Final | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PASS |
|
|
r/i ok needs proper size box 4 gang switch
|
ELE02-00697
| Final | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PASS |
|
|
p/s u/g rec ok
|
ELE02-01426
| Final | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | CANC |
|
|
fn insp heath- ###-####-call 1st before insp-for jackson elem school contractor will call too reschedule for 05/23/02 5/22/2002 6:26:45 PM
|
ELE02-00816
| Electrical Rough-In | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PART |
|
|
sigi- ###-#### r/i ok 5/22/2002 2:27:44 PM
|
ELE02-01225
| Electrical Rough-In | 5/20/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PASS |
|
|
MIJAZ ###-#### r/i ok 5/22/2002 4:20:37 PM
|
ELE02-00173
| Electrical Rough-In | 5/21/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/21/2002 at 11:57:34. Contact: ###-####. library ok r/i 5/22/2002 5:13:23 PM
|