PLM02-01101
| Plumbing Rough-in | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 5/22/2002 7:56:51 AM everythinf except the ejector vtr is ok 5/22/2002 10:55:59 AM
|
PLM02-01459
| Water and/or Sewer | 5/21/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | A | PASS |
|
|
larry ###-#### swr & water
|
PLM02-01462
| Final | 5/21/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | A | FAIL |
|
|
Tom ###-#### water heater leaks and needs to run the t&p to with in 6and 24" of the ground 5/22/2002 8:33:48 AM
|
PLM02-01466
| Sprinkler (Final) | 5/21/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | A | PASS |
|
|
doug ###-####
|
PLM02-01467
| Sprinkler (Final) | 5/21/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | A | PASS |
|
|
judith- ###-####
|
PLM02-01475
| Plumbing Rough-in | 5/21/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PART |
|
|
JAN ###-#### needs above the 2nd floor r/i, in floor ok 5/22/2002 1:49:03 PM
|
PLM02-00960
| Final | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PASS |
|
|
fn insp- mate ###-####
|
PLM02-00685
| Final | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PASS |
|
|
GREG ###-#### LOCK BOX CODE # 139
|
PLM01-04180
| Final | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 08:07:38. Contact: ###-####. test dcva, calk utility sink, set photo sink, no sprinkler permit 5/22/2002 2:46:24 PM
|
PLM02-01420
| Final | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PART |
|
|
ODIE ###-#### provide plumbing fixtures and power to ejectors, temp occ ok 5/22/2002 11:05:00 AM
|
PLM02-00340
| Plumbing Rough-in | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 09:16:21. Contact: ###-####. partial iw test 5/22/2002 5:04:13 PM
|
PLM02-00340
| Roof Drains | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 10:43:09. Contact: ###-####.
|
PLM02-00340
| Water and/or Sewer | 5/22/2002 | 5/22/2002 | 5/22/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 10:44:02. Contact: ###-####.
|