Inspections for the day of: Wednesday, May 22, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-02510 Final5/21/20025/22/20025/22/2002 12:00:00 AMAPASS
JERRY ###-#### KEY AT TOP OF DOOR IF NO ONE THERE
BLD02-00703 BLD-Framing/Rough-in5/21/20025/22/20025/22/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 05/21/2002 at 14:04:27. Contact: 88700409. C/N posted-Do not insulate--Air seal package not done. 5/22/2002 9:45:56 AM
BLD02-00948 BLD-Footing5/21/20025/22/20025/22/2002 12:00:00 AMAPASS
JERRY ###-####
MEC02-00893 Final5/21/20025/22/20025/22/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/21/2002 at 10:49:17. Contact: ###-####. partial for cover
BLD02-00332 BLD-Final5/21/20025/22/20025/22/2002 12:00:00 AMPPASS
george ###-####
BLD02-01049 BLD-Foundation5/22/20025/22/20025/22/2002 12:00:00 AMPPART
found wall wes -###-#### wip--85% ready 5/22/2002 3:35:23 PM
BLD02-00703 BLD-Framing/Rough-in5/22/20025/22/20025/22/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/22/2002 at 09:50:19. Contact: ###-####. Ok to insulate 5/22/2002 2:35:43 PM
MEC02-00784 Final5/22/20025/22/20025/22/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 05/22/2002 at 10:32:58. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/22/2002 at 10:40:48.
BLD01-03255 BLD-Final5/22/20025/22/20025/22/2002 12:00:00 AMPPASS
C. of C. #22404 issued. 5/22/2002 3:36:09 PM
BLD02-01081 BLD-Footing5/22/20025/22/20025/22/2002 12:00:00 AMPPART
ft insp -###-####- jerald --wip-- Rear setback to patio post is not 15 feet. Contacted builder--informed him it's ok to pour house but either a variance request is needed to P. and Z. or shorten the patio to achieve the 15' feet rear setback. 5% ready at time of inspection. 5/22/2002 1:47:16 PM