PLM03-00711
| Final | 5/21/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | A | FAIL |
|
|
KEN; Phone #: ###-#### Internet Inspection Request from: Marsha Smyliec thermol expantion protection required, t&p drain requires an air gap, urinal trim incomplete, going to staff meeting and will find out if there is a code section addressing offsets in flushometer tailpiece. 5/22/2003 9:55:42 AM
|
PLM03-00397
| Plumbing Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 5:06:03 PM. Contact: ###-####. the rest of the 3rd floor ok to cover 5/22/2003 4:51:43 PM
|
PLM03-01483
| Water and/or Sewer | 5/22/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | PASS |
|
|
###-#### garrett water service 5/22/2003 1:52:36 PM
|
PLM03-01486
| Water and/or Sewer | 5/22/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | PASS |
|
|
###-#### dan sw final ok 5/22/2003 2:11:49 PM
|
PLM03-00711
| Final | 5/22/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | PART |
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Annette Moore temp occ ok, needs air gap at the t&p drain, finish urinal trim, the offset on the flushometers is ok and the thermol expantion is already in place at the premise protection. 5/22/2003 3:06:44 PM
|
PLM03-01050
| Final | 5/22/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/22/2003 at 10:51:10 AM. Contact: ###-####. final ok 5/22/2003 1:47:34 PM
|
PLM03-01477
| Sprinkler (Final) | 5/22/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | PART |
|
|
JAMES- ###-#### remove tee upstream of dcva, 2 unions required on below grade dcva installations, ok to cover tie in 5/22/2003 1:31:36 PM
|
PLM03-01420
| Plumbing Rough-in | 5/16/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | PASS |
|
|
###-#### ri ok 5/22/2003 1:16:10 PM
|