BLD01-01875
| BLD-Aging Inspection | 5/22/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | | CANC |
|
|
|
BLD03-00307
| BLD-Aging Inspection | 5/22/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | | CANC |
|
|
no structural inspection requird.ins 5/22/2003 9:38:31 AM
|
BLD03-00504
| BLD-Framing/Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | A | PART |
|
|
###-#### . Framing ok , needs gas test approved ok to insulated. 5/22/2003 11:00:40 AM
|
BLD03-00294
| BLD-Final | 5/21/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | A | FAIL |
|
|
KURT; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieposted a c/n. 5/22/2003 11:25:41 AM
|
BLD02-01065
| BLD-Framing/Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 4:37:01 PM. Contact: ###-####. still needs work as discused. 5/27/2003 9:51:48 AM
|
BLD02-01073
| BLD-Framing/Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 4:46:41 PM. Contact: ###-####.c/n. 5/22/2003 3:32:29 PM
|
BLD02-02718
| BLD-Framing/Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 4:49:29 PM. Contact: ###-####. Myself a nd Carl 340 went out and posted a c/n for engineer to perform site visit,as there is not adequate detailing and hold downs have been eliminated and architect had drawn plans, which was stamped by engineer but no specific detailing provided. 5/27/2003 9:55:20 AM
|
BLD03-01028
| BLD-Footing | 5/22/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | PART |
|
|
###-#### chrisearly statrt appears ok. 5/22/2003 2:19:45 PM
|
BLD03-00522
| BLD-Framing/Rough-in | 5/22/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/22/2003 at 9:18:13 AM. Contact: ###-####.bonus room top cord of truss nailing.at the doubler. c/n also vapor barrier. 5/22/2003 12:13:16 PMcalled contractor. 5/22/2003 12:13:57 PM
|
BLD03-00522
| BLD-Energy code compliance | 5/22/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/22/2003 at 9:18:58 AM. Contact: ###-####. top cord bonus roomtruss and vappor barrier c/n posted called contractor. 5/22/2003 12:13:46 PM
|
BLD03-00251
| BLD-Final | 5/22/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | PASS |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara MooreOk perm oc. 5/23/2003 10:44:57 AM
|
BLD02-02473
| BLD-Framing/Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 10:50:25 AM. Contact: ###-####.Waiting on engineering. 5/22/2003 3:19:54 PM
|
BLD02-02474
| BLD-Framing/Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 10:51:41 AM. Contact: ###-####.c/n in hallway ares ok to insulate. 5/27/2003 9:52:46 AM
|