Inspections for the day of: Thursday, May 22, 2003.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01875 BLD-Aging Inspection5/22/20035/22/20035/22/2003 12:00:00 AM CANC
BLD03-00307 BLD-Aging Inspection5/22/20035/22/20035/22/2003 12:00:00 AM CANC
no structural inspection requird.ins 5/22/2003 9:38:31 AM
BLD03-00504 BLD-Framing/Rough-in5/21/20035/22/20035/22/2003 12:00:00 AMAPART
###-#### . Framing ok , needs gas test approved ok to insulated. 5/22/2003 11:00:40 AM
BLD03-00294 BLD-Final5/21/20035/22/20035/22/2003 12:00:00 AMAFAIL
KURT; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieposted a c/n. 5/22/2003 11:25:41 AM
BLD02-01065 BLD-Framing/Rough-in5/21/20035/22/20035/22/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 5/21/2003 at 4:37:01 PM. Contact: ###-####. still needs work as discused. 5/27/2003 9:51:48 AM
BLD02-01073 BLD-Framing/Rough-in5/21/20035/22/20035/22/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 5/21/2003 at 4:46:41 PM. Contact: ###-####.c/n. 5/22/2003 3:32:29 PM
BLD02-02718 BLD-Framing/Rough-in5/21/20035/22/20035/22/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 5/21/2003 at 4:49:29 PM. Contact: ###-####. Myself a nd Carl 340 went out and posted a c/n for engineer to perform site visit,as there is not adequate detailing and hold downs have been eliminated and architect had drawn plans, which was stamped by engineer but no specific detailing provided. 5/27/2003 9:55:20 AM
BLD03-01028 BLD-Footing5/22/20035/22/20035/22/2003 12:00:00 AMPPART
###-#### chrisearly statrt appears ok. 5/22/2003 2:19:45 PM
BLD03-00522 BLD-Framing/Rough-in5/22/20035/22/20035/22/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 5/22/2003 at 9:18:13 AM. Contact: ###-####.bonus room top cord of truss nailing.at the doubler. c/n also vapor barrier. 5/22/2003 12:13:16 PMcalled contractor. 5/22/2003 12:13:57 PM
BLD03-00522 BLD-Energy code compliance5/22/20035/22/20035/22/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 5/22/2003 at 9:18:58 AM. Contact: ###-####. top cord bonus roomtruss and vappor barrier c/n posted called contractor. 5/22/2003 12:13:46 PM
BLD03-00251 BLD-Final5/22/20035/22/20035/22/2003 12:00:00 AMPPASS
joe; Phone #: ###-#### Internet Inspection Request from: Barbara MooreOk perm oc. 5/23/2003 10:44:57 AM
BLD02-02473 BLD-Framing/Rough-in5/21/20035/22/20035/22/2003 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 5/21/2003 at 10:50:25 AM. Contact: ###-####.Waiting on engineering. 5/22/2003 3:19:54 PM
BLD02-02474 BLD-Framing/Rough-in5/21/20035/22/20035/22/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 5/21/2003 at 10:51:41 AM. Contact: ###-####.c/n in hallway ares ok to insulate. 5/27/2003 9:52:46 AM