FIR06-00213
| INSP-Sprinkler Rough-in/Hydro | 5/22/2006 | 5/22/2006 | 5/22/2006 4:01:04 PM | P | PART |
|
|
The remainder of UG fire supply line including the ductile riser stub is approved for cover.
|
FIR06-00369
| INSP-Final Inspection | 5/19/2006 | 5/22/2006 | 5/22/2006 3:46:32 PM | A | PART |
|
|
Final pending ceiling tile and escutcheons at pendent heads in the drop ceiling areas.
|
FIR06-00370
| INSP-Final Inspection | 5/19/2006 | 5/22/2006 | 5/22/2006 3:45:29 PM | A | NR |
|
|
###-#### Final pending ceiling tile installation and escutcheons at heads.
|
FIR06-00282
| INSP-Final Inspection | 5/19/2006 | 5/22/2006 | 5/22/2006 3:44:05 PM | P | PASS |
|
|
Fire sprinkler passed inspection, permit finaled.
|
FIR06-00369
| INSP-Sprinkler Rough-in | 5/19/2006 | 5/22/2006 | 5/22/2006 11:42:20 AM | A | PART |
|
|
Overhead fire sprinkler work is satisfactory, final pending escutcheons and installation of ceiling tile.
|
FIR06-00370
| INSP-Sprinkler Rough-in | 5/19/2006 | 5/22/2006 | 5/22/2006 11:40:01 AM | A | PART |
|
|
Need to provide vertical restraint at the end hangers per review notes, the remainder of overhead work is acceptable.
|
FIR06-00288
| INSP-Sprinkler Rough-in | 5/19/2006 | 5/22/2006 | 5/22/2006 10:52:21 AM | A | PART |
|
|
Overhead rough-in is acceptable for cover, escutcheons at some locations need adjustment.
|
FIR06-00286
| INSP-Sprinkler Rough-in | 5/19/2006 | 5/22/2006 | 5/22/2006 10:50:35 AM | A | FAIL |
|
|
Sprinkler head in office 632 as marked on approved plans is overspaced, remainder of rough-in is good for cover.
|