Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00213 INSP-Sprinkler Rough-in/Hydro5/22/20065/22/20065/22/2006 4:01:04 PMPPART
The remainder of UG fire supply line including the ductile riser stub is approved for cover.
FIR06-00369 INSP-Final Inspection5/19/20065/22/20065/22/2006 3:46:32 PMAPART
Final pending ceiling tile and escutcheons at pendent heads in the drop ceiling areas.
FIR06-00370 INSP-Final Inspection5/19/20065/22/20065/22/2006 3:45:29 PMANR
###-#### Final pending ceiling tile installation and escutcheons at heads.
FIR06-00282 INSP-Final Inspection5/19/20065/22/20065/22/2006 3:44:05 PMPPASS
Fire sprinkler passed inspection, permit finaled.
FIR06-00369 INSP-Sprinkler Rough-in5/19/20065/22/20065/22/2006 11:42:20 AMAPART
Overhead fire sprinkler work is satisfactory, final pending escutcheons and installation of ceiling tile.
FIR06-00370 INSP-Sprinkler Rough-in5/19/20065/22/20065/22/2006 11:40:01 AMAPART
Need to provide vertical restraint at the end hangers per review notes, the remainder of overhead work is acceptable.
FIR06-00288 INSP-Sprinkler Rough-in5/19/20065/22/20065/22/2006 10:52:21 AMAPART
Overhead rough-in is acceptable for cover, escutcheons at some locations need adjustment.
FIR06-00286 INSP-Sprinkler Rough-in5/19/20065/22/20065/22/2006 10:50:35 AMAFAIL
Sprinkler head in office 632 as marked on approved plans is overspaced, remainder of rough-in is good for cover.