Inspections for the day of: Thursday, May 22, 2008.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00317 INSP-Sprinkler Rough-in/Hydro5/21/20085/22/20085/22/2008 5:18:43 PMPPASS
Sprinkler piping is ok to cover.
FIR08-00362 INSP-Final Inspection5/21/20085/22/20085/22/2008 4:20:12 PMPPASS
Full function test on kitchen fire supression system. kr
FIR08-00340 INSP-Final Inspection5/22/20085/22/20085/22/2008 3:34:11 PMPPASS
Permit finaled
FIR07-00213 INSP-Sprinkler Rough-in/Hydro5/21/20085/22/20085/22/2008 3:29:57 PMPPASS
Underground hydro test passed
FIR07-00212 INSP-Sprinkler Rough-in/Hydro5/21/20085/22/20085/22/2008 3:28:57 PMPPASS
Underground hydro test passed
FIR08-00204 INSP-Sprinkler Rough-in/Hydro5/21/20085/22/20085/22/2008 3:25:55 PMACANC
Tenting was not complete per the fitter. No inspection performed
FIR08-00166 INSP-Final Inspection5/20/20085/22/20085/22/2008 3:02:44 PMPPASS
Fire alarm testing complete. KR
BLD08-00280 FIRE-Final Inspection5/21/20085/22/20085/22/2008 1:16:19 PMAPASS
Life safety passed
BLD08-00193 FIRE-Final Inspection5/21/20085/22/20085/22/2008 12:34:44 PMACANC
Could not get power to building to test mag locks.
FIR08-00076 INSP-Final Inspection5/21/20085/22/20085/22/2008 12:22:38 PMAFAIL
Provide modifications to the attic area a/v's as discussed to meet code requirements. Need to test the duct smoke detectors and in-duct detectors in heat mode to verify shutdown. Many of the main level a/v's are not using temporal but are sounding with two pulses the same time as other are doing the temporal. The a/v in room 202 is overspaced. As-builts will be needed prior to sign off of this permit.
FIR08-00250 INSP-Final Inspection5/21/20085/22/20085/22/2008 11:58:57 AMAPASS
permit finaled
BLD07-01943 FIRE-Final Inspection5/21/20085/22/20085/22/2008 11:57:52 AMAPASS
life safety passed
BLD07-02935 FIRE-Final Inspection5/21/20085/22/20085/22/2008 11:30:57 AMAFAIL
See the city approved notes for items circled in red ink that need addressed. Items include the correct annunciators for the duct smoke detectors, address installed, emergency lighting and exit signs tested....ect. Also a suppression system has been installed and I can find no attached FIR permit for this work. Per the general contractor the installer was General Fire. I contacted Scott in our office about double fees when this permit comes in. Basically not inspection was performed but a conference was held.
BLD08-00281 FIRE-Final Inspection5/21/20085/22/20085/22/2008 11:19:43 AMAPASS
Life safety passed
BLD07-02099 FIRE-Final Inspection5/21/20085/22/20085/22/2008 10:12:15 AMAPASS
Life safety passed
FIR08-00214 INSP-Conference5/21/20085/22/20085/22/2008 7:40:08 AMADONE
The high area sprinkler piping can now be covered.