Inspections for the day of: Friday, May 22, 2009.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00839 INSP-Sprinkler Rough-in/Hydro5/22/20095/22/20095/25/2009 9:32:50 PMPPART
See inspection comments per T. Frost.
FIR09-00248 INSP-Sprinkler Rough-in/Hydro5/21/20095/22/20095/25/2009 9:26:48 PMAFAIL
UG supply line hydrostatic test failed due to pressure loss at the guage per inspection completed by T. Frost.
FIR09-00256 INSP-Sprinkler Rough-in/Hydro5/21/20095/22/20095/25/2009 9:26:17 PMAFAIL
UG supply line hydrostatic test failed due to pressure loss at the guage per inspection completed by T. Frost.
FIR09-00255 INSP-Sprinkler Rough-in/Hydro5/21/20095/22/20095/25/2009 9:25:29 PMAFAIL
UG supply line hydrostatic test failed due to pressure loss at the guage per inspection completed by T. Frost.
BLD09-00598 FIRE-Final Inspection5/22/20095/22/20095/25/2009 9:19:43 PMPPASS
Life safety is acceptable, missing doors and hardware a two locations to be installed for verification prior to structrual inspection as discussed.
FIR09-00280 INSP-Final Inspection5/22/20095/22/20095/25/2009 9:12:30 PMPPASS
Noted corrections field verified for completion, fire sprinkler permit finaled.
FIR09-00288 INSP-Final Inspection5/22/20095/22/20095/25/2009 9:11:07 PMPPASS
Fire alarm permit finaled.
FIR09-00236 INSP-Final Inspection5/22/20095/22/20095/25/2009 9:10:10 PMPPASS
Fire sprinkler permit approved for final.
FIR09-00288 INSP-Alarm Testing5/21/20095/22/20095/25/2009 9:07:57 PMAPASS
Fire alarm field testing passed, permit okay for final.
BLD09-00390 FIRE-Final Inspection5/22/20095/22/20095/22/2009 12:41:48 PMPPASS
Fire life safety inspection passed, contractor has removed locking hardware at the managers office door.
FIR09-00164 INSP-Sprinkler Rough-in/Hydro5/21/20095/22/20095/22/2009 12:40:30 PMAPART
See stamped plan set for overhead rough-in inspected to date.
BLD08-02286 FIRE-Final Inspection5/21/20095/22/20095/22/2009 12:39:23 PMAPASS
Project related fire alarm permit has been finaled, fire life safety is acceptable.
FIR09-00309 INSP-Final Inspection5/21/20095/22/20095/22/2009 12:37:04 PMAPASS
Fire alarm permit finaled.
BLD08-02488 FIRE-Final Inspection5/21/20095/22/20095/22/2009 12:36:39 PMAPASS
Noted plan modification okayed, fire life safety final walkthrough passed.
FIR09-00101 INSP-Final Inspection5/21/20095/22/20095/22/2009 12:35:30 PMAPASS
All corrections per last inspection are finished, fire sprinkler permit finaled.
FIR06-00297 INSP-Final Inspection5/21/20095/22/20095/22/2009 12:34:38 PMAPASS
Fire sprinkler permit okayed for final.
FIR06-00167 INSP-Final Inspection5/21/20095/22/20095/22/2009 12:34:01 PMAPASS
Fire sprinkler demo permit approved for final.
FIR09-00133 INSP-Final Inspection5/22/20095/22/20095/22/2009 12:12:53 PMPPART
Final pending fire alarm system interconnections for riser supervision, trip testing, forward flow, final walkthrough, etc.
BLD08-01796 FIRE-Final Inspection5/21/20095/22/20095/22/2009 12:08:02 PMANR
Project related fire alarm permit work has not been requested for inspection to date (as of 12:00 pm on 5/22). Fire alarm work must be completed, pre-tested and called for final prior to building life safety approval.