FIR13-00037
| INSP-Sprinkler Rough-in/Hydro | 5/22/2013 | 5/22/2013 | 5/22/2013 3:44:19 PM | P | PASS |
|
|
The 200lb hydro on the basement system passed. Sprinkler rough-in for the basement passed inspection and the remaining ceiling tile areas can be installed. I noted one location that an upright sprinkler needs to be installed as per plans, one painted head that needs replaced and one bent all thread rod that needs replaced. Also the remaining hardlids, except for the unfinished restrooms, on the first floor can be installed to cover the sprinkler piping.
|
FIR13-00115
| INSP-Final Inspection | 5/22/2013 | 5/22/2013 | 5/22/2013 3:28:04 PM | P | PART |
|
|
The fire sprinkler work in the Procedure and Clean Rooms is complete.
|
BLD13-00308
| FIRE-Final Inspection | 5/22/2013 | 5/22/2013 | 5/22/2013 1:29:42 PM | P | FAIL |
|
|
The contractor had the approved plans but still does not have the small documents. I explained the electronic plan review process and the need for all of the documents. Fire extinguisher has been provided at pumps.
|
FIR13-00126
| INSP-Alarm Testing | 5/21/2013 | 5/22/2013 | 5/22/2013 10:40:31 AM | A | DONE |
|
|
The fire alarm testing for the Procedure Room and Clean Room passed inspection. I noted that the existing chimes and strobes start out as syncing but eventually don't sync. I feel that with the different tones and two patterns this is not causing undo confusion.
|
BLD13-01192
| FIRE-Final Inspection | 5/22/2013 | 5/22/2013 | 5/22/2013 10:27:41 AM | P | PASS |
|
|
life safety passed
|
BLD13-00308
| FIRE-Final Inspection | 5/21/2013 | 5/22/2013 | 5/22/2013 9:23:09 AM | A | FAIL |
|
|
No city approved plans or notes on site. I noted that a fire extinguisher is required at the pumps since they exceed 75' from the one in the building.
|