Inspections for the day of: Wednesday, May 22, 2013.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS13-00118 BLD-Conference5/8/20135/22/20135/24/2013 11:37:52 AMADONE
Homeowner not home. Was able to observe the rear yard, appears that hole has been backfilled. North fence line appears to be serviceable, patio has been backfilled as well. Not able to observe west side of house at this time.
BLD12-03123 BLD-Framing/Rough-in5/22/20135/22/20135/22/2013 4:21:25 PMPCANC
Toli-Flooring inspection please Phone #: ###-####.
BLD12-02628 BLD-Final5/22/20135/22/20135/22/2013 4:10:45 PMPPASS
Ok for perm occ. al issues were resolved. Engineer has resolved non compliances on special inspection report.
GCB13-00062 GCB-Footing5/21/20135/22/20135/22/2013 4:05:59 PMPPASS
Heron ###-#### after 3:00
BLD12-03081 BLD-Ceiling Grid Inspection5/22/20135/22/20135/22/2013 2:47:44 PMPPASS
Eric Phone #: ###-####
GCB13-00017 GCB-Final5/21/20135/22/20135/22/2013 2:46:52 PMPFAIL
###-####. Post blower door test results or the 3rd party airseal inspection reoprt. Complete the required enrgy cert.
GCB13-00016 GCB-Final5/21/20135/22/20135/22/2013 2:45:58 PMPFAIL
###-####. Post blower door test results or the 3rd party airseal inspection reoprt. Complete the required enrgy cert.
MIS13-00142 BLD-Conference5/22/20135/22/20135/22/2013 2:39:49 PMPDONE
Complaint of roofing work being done without a permit
MIS13-00142 DOC - Permit Finaled5/22/20135/22/20135/22/2013 2:39:35 PMPPASS
A permit has been issued.
BLD13-00319 BLD-Wall Bracing5/21/20135/22/20135/22/2013 11:19:22 AMANR
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD13-00325 BLD-Wall Bracing5/21/20135/22/20135/22/2013 11:18:51 AMANR
Shear firewall Phone #: ###-#### >> Inspection requested via web by James Larkin
ESC13-00139 Random Inspection5/22/20135/22/20135/22/2013 11:12:29 AMAPASS
BLD13-00324 BLD-Wall Bracing5/21/20135/22/20135/22/2013 11:11:19 AMAPASS
Shear firewall construction. Zippidy do da Phone #: ###-#### >> Inspection requested via web by James Larkin
ESC13-00132 Random Inspection5/22/20135/22/20135/22/2013 11:10:02 AMAPASS
BLD13-00318 BLD-Wall Bracing5/21/20135/22/20135/22/2013 11:09:28 AMAPART
Firewall Phone #: ###-#### >> Inspection requested via web by James Larkin
ESC13-00195 Random Inspection5/22/20135/22/20135/22/2013 10:32:13 AMAPASS
BLD13-00444 BLD-Wall Bracing5/21/20135/22/20135/22/2013 10:31:51 AMAPASS
paul Phone #: ###-####
BLD13-00996 BLD-Ceiling Grid Inspection5/21/20135/22/20135/22/2013 10:19:30 AMAPASS
BOB Phone #: ###-####
BLD13-00877 BLD-Final5/21/20135/22/20135/22/2013 9:21:39 AMAPASS
MARK Phone #: ###-####
BLD13-00877 DOC - Permit Finaled5/22/20135/22/20135/22/2013 9:21:25 AMPPASS