BLD14-00928
| FIRE-Final Inspection | 5/22/2014 | 5/22/2014 | 5/22/2014 5:01:04 PM | P | PASS |
|
|
Life safety inspection passed provided one additional PFE is posted at the second floor level as agreed. Surface bolt at the main entry/exit removed while on site.
|
FIR14-00143
| INSP-Sprinkler Rough-in/Hydro | 5/21/2014 | 5/22/2014 | 5/22/2014 4:58:01 PM | P | PART |
|
|
Overhead work per the scope of work okay for ceiling cover. One head location adjusted while on site. Hydrostatic test at system working pressure passed.
|
FIR14-00241
| INSP-Sprinkler Rough-in | 5/22/2014 | 5/22/2014 | 5/22/2014 4:55:02 PM | P | PART |
|
|
Inspection for cover at branch feeds to SW heads in the grill area completed- okayed for sheetrock wall cover, tie-ins not yet finished.
|
FIR14-00231
| INSP-Sprinkler Rough-in | 5/22/2014 | 5/22/2014 | 5/22/2014 4:53:23 PM | P | PART |
|
|
Intended for FIR14-00241
|
BLD14-01023
| FIRE-Final Inspection | 5/22/2014 | 5/22/2014 | 5/22/2014 4:52:51 PM | P | FAIL |
|
|
Noted items include; missing one exit sign, need to post "door to remain..." signage, post two fire extinguishers, provide approved hardware at the warehouse exit doors.
|
BLD14-01023
| FIRE-Final Inspection | 5/21/2014 | 5/22/2014 | 5/22/2014 11:05:09 AM | A | NH |
|
|
Chris-please call prior to meet Phone #: ###-#### *Requested inspection be rescheduled for PM
|
FIR13-00723
| INSP-Sprinkler Rough-in | 5/21/2014 | 5/22/2014 | 5/22/2014 10:38:04 AM | A | PART |
|
|
Overhead work okay to cover at both the east and west side feed mains to office areas on the 2nd, 1st, and basement floor levels. Okay to cover work at one additional room as marked and dated on plans- basement level. Noted floorplan changes from original drawings.
|