BLD15-01526
| BLD-Framing/Rough-in | 5/21/2015 | 5/22/2015 | 5/22/2015 3:55:04 PM | P | PASS |
|
|
would like call ahead; Danny Phone #: ###-####
|
BLD14-03660
| BLD-Wall Bracing | 5/22/2015 | 5/22/2015 | 5/22/2015 3:20:13 PM | P | NR |
|
|
Shear only. Framers are on site. Call if any problems
Thanks much. Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin not built per aproved pan or engineering.
|
BLD15-00401
| BLD-Final | 5/21/2015 | 5/22/2015 | 5/22/2015 2:47:11 PM | A | CANC |
|
|
Call prior to going Phone #: 8907534 >> Inspection requested via mobile web by Jason werre
|
BLD15-00436
| BLD-Final | 5/22/2015 | 5/22/2015 | 5/22/2015 2:46:57 PM | P | PASS |
|
|
Chris Phone #: ###-####
|
BLD15-01080
| BLD-Framing/Rough-in | 5/22/2015 | 5/22/2015 | 5/22/2015 2:39:55 PM | P | PASS |
|
|
Chris Phone #: ###-#### need steel col. fire protection all walls ok
|
BLD15-00337
| BLD-Foundation | 5/22/2015 | 5/22/2015 | 5/22/2015 2:05:06 PM | P | PASS |
|
|
wall // Aldero Phone #: ###-####
|
BLD15-00289
| BLD-Final | 5/21/2015 | 5/22/2015 | 5/22/2015 1:41:27 PM | A | NR |
|
|
Sheet rock up, taped, textured and painted, ceiling grid is in but no tiles have been placed, electrical is in place but not finaled (inspection scheduled), fire sprinkler inspection scheduled for 5/21/15 pm, want to complete all inspections for temporary occupancy permitting. Please call me with any questions. Phone #: ###-#### Inspection requested via web by Jason Jones
|
BLD15-00289
| BLD-Energy code compliance | 5/21/2015 | 5/22/2015 | 5/22/2015 1:40:13 PM | A | NR |
|
|
Sheet rock up, taped, textured and painted, ceiling grid is in but no tiles have been placed, electrical is in place but not finaled (inspection scheduled), fire sprinkler inspection scheduled for 5/21/15 pm, want to complete all inspections for temporary occupancy permitting. Please call me with any questions. Phone #: ###-#### Inspection requested via web by Jason Jones
|
BLD15-00289
| BLD-Ceiling Grid Inspection | 5/21/2015 | 5/22/2015 | 5/22/2015 1:38:41 PM | A | PART |
|
|
Sheet rock up, taped, textured and painted, ceiling grid is in but no tiles have been placed, electrical is in place but not finaled (inspection scheduled), fire sprinkler inspection scheduled for 5/21/15 pm, want to complete all inspections for temporary occupancy permitting. Please call me with any questions. Phone #: ###-#### Inspection requested via web by Jason Jones two offices south end of building ceilling ok/ ok to use space with progrestion of const.
|
BLD15-01312
| BLD-Footing | 5/22/2015 | 5/22/2015 | 5/22/2015 1:04:17 PM | P | PASS |
|
|
Dane Phone #: ###-#### center ft to be placed at slab insp.
|
BLD12-01277
| BLD - Resubmittal Approved | 5/20/2015 | 5/22/2015 | 5/22/2015 11:55:54 AM | A | PASS |
|
|
Daniel// please call before Phone #: ###-#### 180 days
|
BLD12-01277
| Extend Permit 90/180 days | 5/22/2015 | 5/22/2015 | 5/22/2015 11:55:30 AM | A | PASS |
|
|
Daniel// please call before Phone #: ###-####
|
BLD15-00773
| BLD-Energy code compliance | 5/21/2015 | 5/22/2015 | 5/22/2015 11:16:14 AM | A | PASS |
|
|
Insulation // Terry Phone #: ###-####
|
BLD13-02424
| BLD-Energy code compliance | 5/21/2015 | 5/22/2015 | 5/22/2015 10:36:59 AM | A | CANC |
|
|
Level 3 west perimeter wall insulation inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilsonsoffits ok lev2 east
|
BLD13-02425
| BLD-Framing/Rough-in | 5/21/2015 | 5/22/2015 | 5/22/2015 10:35:52 AM | A | PASS |
|
|
Level 4 East unit framing and stair well A for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD15-01015
| BLD-Wall Bracing | 5/21/2015 | 5/22/2015 | 5/21/2015 3:53:14 PM | A | CANC |
|
|
Shear inspection, plans on site Phone #: ###-#### >> Inspection requested via web by Erby Gonzales Inspection cancelled from web by: Erby Gonzales
|