Inspections for the day of: Friday, May 22, 2015.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-01526 BLD-Framing/Rough-in5/21/20155/22/20155/22/2015 3:55:04 PMPPASS
would like call ahead; Danny Phone #: ###-####
BLD14-03660 BLD-Wall Bracing5/22/20155/22/20155/22/2015 3:20:13 PMPNR
Shear only. Framers are on site. Call if any problems

Thanks much. Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin not built per aproved pan or engineering.
BLD15-00401 BLD-Final5/21/20155/22/20155/22/2015 2:47:11 PMACANC
Call prior to going Phone #: 8907534 >> Inspection requested via mobile web by Jason werre
BLD15-00436 BLD-Final5/22/20155/22/20155/22/2015 2:46:57 PMPPASS
Chris Phone #: ###-####
BLD15-01080 BLD-Framing/Rough-in5/22/20155/22/20155/22/2015 2:39:55 PMPPASS
Chris Phone #: ###-#### need steel col. fire protection all walls ok
BLD15-00337 BLD-Foundation5/22/20155/22/20155/22/2015 2:05:06 PMPPASS
wall // Aldero Phone #: ###-####
BLD15-00289 BLD-Final5/21/20155/22/20155/22/2015 1:41:27 PMANR
Sheet rock up, taped, textured and painted, ceiling grid is in but no tiles have been placed, electrical is in place but not finaled (inspection scheduled), fire sprinkler inspection scheduled for 5/21/15 pm, want to complete all inspections for temporary occupancy permitting. Please call me with any questions. Phone #: ###-#### Inspection requested via web by Jason Jones
BLD15-00289 BLD-Energy code compliance5/21/20155/22/20155/22/2015 1:40:13 PMANR
Sheet rock up, taped, textured and painted, ceiling grid is in but no tiles have been placed, electrical is in place but not finaled (inspection scheduled), fire sprinkler inspection scheduled for 5/21/15 pm, want to complete all inspections for temporary occupancy permitting. Please call me with any questions. Phone #: ###-#### Inspection requested via web by Jason Jones
BLD15-00289 BLD-Ceiling Grid Inspection5/21/20155/22/20155/22/2015 1:38:41 PMAPART
Sheet rock up, taped, textured and painted, ceiling grid is in but no tiles have been placed, electrical is in place but not finaled (inspection scheduled), fire sprinkler inspection scheduled for 5/21/15 pm, want to complete all inspections for temporary occupancy permitting. Please call me with any questions. Phone #: ###-#### Inspection requested via web by Jason Jones two offices south end of building ceilling ok/ ok to use space with progrestion of const.
BLD15-01312 BLD-Footing5/22/20155/22/20155/22/2015 1:04:17 PMPPASS
Dane Phone #: ###-#### center ft to be placed at slab insp.
BLD12-01277 BLD - Resubmittal Approved5/20/20155/22/20155/22/2015 11:55:54 AMAPASS
Daniel// please call before Phone #: ###-#### 180 days
BLD12-01277 Extend Permit 90/180 days5/22/20155/22/20155/22/2015 11:55:30 AMAPASS
Daniel// please call before Phone #: ###-####
BLD15-00773 BLD-Energy code compliance5/21/20155/22/20155/22/2015 11:16:14 AMAPASS
Insulation // Terry Phone #: ###-####
BLD13-02424 BLD-Energy code compliance5/21/20155/22/20155/22/2015 10:36:59 AMACANC
Level 3 west perimeter wall insulation inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilsonsoffits ok lev2 east
BLD13-02425 BLD-Framing/Rough-in5/21/20155/22/20155/22/2015 10:35:52 AMAPASS
Level 4 East unit framing and stair well A for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD15-01015 BLD-Wall Bracing5/21/20155/22/20155/21/2015 3:53:14 PMACANC
Shear inspection, plans on site Phone #: ###-#### >> Inspection requested via web by Erby Gonzales Inspection cancelled from web by: Erby Gonzales