ELE15-01470
| Final | 5/22/2015 | 5/22/2015 | 5/26/2015 3:41:22 PM | P | PASS |
|
|
Please call if there are any problems. Thanks. Phone #: ###-#### Inspection requested via web by Clay Morgan final ok
|
ELE15-01470
| Electrical Rough-In | 5/22/2015 | 5/22/2015 | 5/26/2015 3:40:49 PM | P | PASS |
|
|
Please call if there are any problems. Thanks. Phone #: ###-#### Inspection requested via web by Clay Morgan r/i u. ground ok
|
ELE14-02482
| Final | 5/22/2015 | 5/22/2015 | 5/26/2015 1:07:20 PM | P | CANC |
|
|
Any questions get ahold of Tony Young finaled out by Bob R.
|
ELE15-01055
| Electrical Rough-In | 5/22/2015 | 5/22/2015 | 5/26/2015 9:31:58 AM | P | PASS |
|
|
late rough in cover inspect as possible Phone #: ###-#### Inspection requested via web by Don Lustig r/i ok new counter ok
|
ELE13-01291
| Electrical Rough-In | 5/20/2015 | 5/22/2015 | 5/26/2015 9:07:28 AM | P | PASS |
|
|
Contact Brandon Robinson for level 6 kitchen ceiling inspection. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ceiling ok
|
ELE15-01343
| Rough-In Permanent Service | 5/21/2015 | 5/22/2015 | 5/22/2015 4:59:51 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman r/i ok house and garage p/s o/h n ok
|
ELE15-01303
| Electrical Rough-In | 5/22/2015 | 5/22/2015 | 5/22/2015 4:21:16 PM | P | PASS |
|
|
Please call 30 minutes in advance and Shawn will meet you there. Earlier the better! Phone #: ###-#### Inspection requested via web by Kerri Hamilton 4" conduit for fiber optic ok to cover
|
ELE14-03333
| Electrical Rough-In | 5/21/2015 | 5/22/2015 | 5/22/2015 3:55:43 PM | P | PASS |
|
|
Contact: Mike Ennis Phone #: ###-#### Inspection requested via web by Deb Gooden 4th flr wing 1 and 2 hallway soffits r/i ok. 4th flr wing 1 rm. soffits r/i ok
|
GCE15-00074
| GCE-Final | 5/20/2015 | 5/22/2015 | 5/22/2015 2:59:44 PM | P | PASS |
|
|
Kelley ###-#### - requested call ahead r/i and final ok new high bay fixtures and 220volt to unit heaters
|
ELE10-01638
| Final | 5/21/2015 | 5/22/2015 | 5/22/2015 2:16:03 PM | A | FAIL |
|
|
David Phone #: ###-#### rearrange breakers so 100 amp breaker feeding house is at bottom of main panel and 60amp breaker maximum on garage panel and cut hole so grounding electrode conductor is accessable
|
ELE15-01506
| Permanent Service | 5/22/2015 | 5/22/2015 | 5/22/2015 1:52:51 PM | P | PASS |
|
|
Changed bad 2 gang meter for 4888 and 4886 Blaser. grounding was up dated. Exiting distribution panels remain. Phone #: ###-#### Inspection requested via web by Alan Lusk p/s o/h rec ok NOTE;ALREADY HOOKED UP
|
ELE15-01506
| Final | 5/22/2015 | 5/22/2015 | 5/22/2015 1:51:45 PM | P | PASS |
|
|
Changed bad 2 gang meter for 4888 and 4886 Blaser. grounding was up dated. Exiting distribution panels remain. Phone #: ###-#### Inspection requested via web by Alan Lusk final ok
|
ELE15-00719
| Electrical Rough-In | 5/21/2015 | 5/22/2015 | 5/22/2015 1:16:46 PM | A | PASS |
|
|
See Dan on site Phone #: ###-#### Inspection requested via web by Dan Mitchell r/i ok upst. rear unit only
|
ELE15-01230
| Final | 5/21/2015 | 5/22/2015 | 5/22/2015 12:16:07 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brad Baker final ok
|
ELE14-02482
| Final | 5/21/2015 | 5/22/2015 | 5/22/2015 11:57:08 AM | A | FAIL |
|
|
Shannon-homeowner is requesting final on all subs-she says work is done and needs bldg final as well-please call 30 minutes prior to meet Phone #: ###-#### GFCI for jetted tub needs to be accessable. Label garage panel. Please have Vic or someone who can show me where your work starts and stops.
|
ELE15-01090
| Electrical Rough-In | 5/22/2015 | 5/22/2015 | 5/22/2015 11:12:21 AM | P | PASS |
|
|
Jay Phone #: ###-#### r/i ok including HR's
|
ELE15-01102
| Electrical Rough-In | 5/21/2015 | 5/22/2015 | 5/22/2015 10:37:13 AM | A | PASS |
|
|
track bond, equopotential plane around pool, pool deck is pavers Phone #: ###-#### Inspection requested via web by Kevin Koomler r/i ok eq. bond and track bonding
|
ELE15-01354
| Final | 5/21/2015 | 5/22/2015 | 5/22/2015 9:58:47 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean final ok
|
ELE14-03333
| Electrical Rough-In | 5/21/2015 | 5/22/2015 | 5/22/2015 9:27:10 AM | A | PASS |
|
|
Contact: Mike Ennis Phone #: ###-#### Inspection requested via web by Deb Gooden r/i ok 4th flr /sect 2 hallway soffits
|
ELE14-03246
| Electrical Rough-In | 5/21/2015 | 5/22/2015 | 5/22/2015 8:40:05 AM | A | PASS |
|
|
Levi. Tower 2 Elevator Lobby''s 2-5. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i elevator lobby #1 ceilings 2 thru 5 ok
|
ELE15-02132
| Electrical Rough-In | 5/22/2015 | 5/22/2015 | 5/22/2015 12:00:00 AM | A | PASS |
|
|
Stairwell "B" inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo r/i ok stairwell B 2 thru 5 and vent. shaft 242
|