FIR15-00002
| INSP-Sprinkler Rough-in/Hydro | 5/22/2015 | 5/22/2015 | 5/22/2015 5:17:59 PM | P | PART |
|
|
Overhead hydrostatic test of the new wet systems basement, first and second floors completed satisfactory.
|
FIR15-00246
| INSP-Sprinkler Rough-in | 5/21/2015 | 5/22/2015 | 5/22/2015 5:10:42 PM | A | PART |
|
|
Fire sprinkler modifications at the tenant remodel area okayed for cover at the grid ceilings.
|
BLD14-03581
| FIRE-Conference | 5/22/2015 | 5/22/2015 | 5/22/2015 12:51:34 PM | P | DONE |
|
|
On site conference with tenant regarding fire extinguisher placement and life safety inspection items.
|
BLD15-00436
| FIRE-Final Inspection | 5/22/2015 | 5/22/2015 | 5/22/2015 12:43:20 PM | P | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR15-00139
| INSP-Final Inspection | 5/21/2015 | 5/22/2015 | 5/22/2015 12:38:06 PM | A | PASS |
|
|
Scope of fire sprinkler work completed and passed final walkthrough.
|
BLD15-00289
| FIRE-Final Inspection | 5/21/2015 | 5/22/2015 | 5/22/2015 12:33:37 PM | A | NR |
|
|
Project not in condition for final inspection at this time. Discussed inspection categories, related trade work, project phasing and completion dates with contractor.
|
FIR15-00346
| INSP-Final Inspection | 5/21/2015 | 5/22/2015 | 5/22/2015 12:28:52 PM | A | PART |
|
|
Okay to cover fire sprinkler work at the grid ceiling areas. Note- new wall to create a break room and grid ceiling above the back exit corridor are not to be installed as shown on plans per tenant. Rough-in only at this time due to incomplete finishes.
|
FIR14-00935
| INSP-Final Inspection | 5/21/2015 | 5/22/2015 | 5/22/2015 12:03:42 PM | A | PASS |
|
|
Fire sprinkler permit work passed final walkthrough.
|