Inspections for the day of: Friday, May 22, 2015.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-00787 BLD-Framing/Rough-in5/22/20155/22/20155/22/2015 5:16:06 PMPPART
As early as possible Phone #: 3534535 >> Inspection requested via mobile web by Tom Andrews,, front counter walls ok pending trades
BLD15-00690 BLD-Framing/Rough-in5/22/20155/22/20155/22/2015 5:12:22 PMPNR
Brandon Phone #: ###-####
BLD15-00689 BLD-Framing/Rough-in5/22/20155/22/20155/22/2015 5:10:17 PMPNR
Brandon Phone #: ###-####
GCB14-00172 GCB-Shearwall5/22/20155/22/20155/22/2015 4:39:24 PMPPASS
Mike ###-####,, interior shear ok
BLD15-00750 BLD-Energy code compliance5/21/20155/22/20155/22/2015 4:04:14 PMPPASS
Colby Phone #: ###-####
BLD15-00560 BLD-Final5/22/20155/22/20155/22/2015 4:03:50 PMADONE
Colby Phone #: ###-####
BLD15-00560 BLD-Blower Door Test Results5/22/20155/22/20155/22/2015 4:03:14 PMPPASS
Colby Phone #: ###-####/// 5.3
BLD15-00560 BLD-Final5/21/20155/22/20155/22/2015 4:02:10 PMPPASS
Colby Phone #: ###-####
BLD15-00560 DOC - Permit Finaled5/22/20155/22/20155/22/2015 4:01:43 PMPPASS
c of o issued
BLD14-02098 BLD-Final5/22/20155/22/20155/22/2015 3:23:51 PMPPEND
Informed Shannon if Tuesday afternoon does't work for Matt H to give me a call so that the time for you (Tony) could be changed
BLD15-00845 BLD-Final5/22/20155/22/20155/22/2015 3:17:15 PMPPASS
would like call ahead; Zach Phone #: ###-####
BLD15-00845 DOC - Permit Finaled5/22/20155/22/20155/22/2015 3:16:44 PMPPASS
done,, will move dryer vent
BLD14-02131 BLD-Final5/22/20155/22/20155/22/2015 2:02:47 PMPPEND
Shannon-homeowner is requesting final on all subs-she says work is done and needs bldg final as well-please call 30 minutes prior to meet Phone #: ###-####,, need all other finals including historical
BLD15-00296 BLD-Energy code compliance5/21/20155/22/20155/22/2015 12:41:02 PMAPART
Second floor insulation Phone #: ###-#### Inspection requested via web by Shane Treasure,, walls ok to cover on 2nd floor
BLD15-01355 BLD-Conference5/21/20155/22/20155/22/2015 12:39:27 PMAPART
jet Phone #: ###-####,, ?s on stairs
BLD15-01403 BLD-Final5/21/20155/22/20155/22/2015 10:37:25 AMAPASS
Rich Phone #: ###-####
BLD15-01403 DOC - Permit Finaled5/22/20155/22/20155/22/2015 10:37:08 AMPPASS
done
BLD15-00392 BLD-Wall Bracing5/21/20155/22/20155/22/2015 10:23:53 AMAPART
Dan Phone #: ###-####,, garage wall bracing ok
GCB14-00158 GCB-Final5/21/20155/22/20155/22/2015 10:22:01 AMANR
Joe ###-#### - requested call ahead
BLD15-00689 BLD-Framing/Rough-in5/21/20155/22/20155/22/2015 9:32:47 AMANR
Brandon Phone #: ###-####
BLD15-00690 BLD-Framing/Rough-in5/21/20155/22/20155/22/2015 9:32:15 AMANR
Brandon Phone #: ###-####