Inspections for the day of: Friday, May 22, 2015.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorThomas Walsh
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00478 INSP-Sprinkler Rough-in5/21/20155/22/20155/22/2015 1:01:09 PMPCANC
This is for the 4th floor, Area 3 soffits. Mark is the contact. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR15-00313 INSP-Sprinkler Rough-in5/21/20155/22/20155/22/2015 12:37:51 PMAPART
Visual inspection of FS U/G from city conection to BOR stub up. Thrust block in place. U/G has not been hydrotested yet, so covering of pipe is at the contractor's risk.
FIR14-00252 INSP-Sprinkler Rough-in/Hydro5/21/20155/22/20155/22/2015 11:19:47 AMAPART
Hydrotest of first floor kitchen and lobby system - 200 psi @ 2 hours - PASSED
NOTE: 2nd floor tested OK yesterday.
FIR14-00729 INSP-Conference5/21/20155/22/20155/22/2015 10:30:39 AMADONE
Met with Brian Anderson (Simplex Grinnel) to discuss expectations for testing of phase 1 and TCO of this area while work on phase 2 is ongoing. I told Brian that it is our expectation that the phase 1 portion of the system be completely 100% pretested, with all coorections made, prior to calling us for our inspection/test. He said that he will communicate this to the GC.