BLD15-00442
| BLD-Energy code compliance | 5/22/2015 | 5/22/2015 | 5/22/2015 4:37:22 PM | P | PASS |
|
|
###-#### Inspection requested via web by Erby Gonzales
|
BLD15-00766
| BLD-Wall Bracing | 5/22/2015 | 5/22/2015 | 5/22/2015 4:31:45 PM | P | FAIL |
|
|
Shear inspection, rescheduled for PM. Plans on site Inspection requested via web by Erby Gonzales. replace sheeting on portal framethe nails are over shot. All s1 shear panels need to have 8D at 6" and 12" or staples at 3" and 6" CN posted
|
BLD14-03219
| BLD-Framing/Rough-in | 5/21/2015 | 5/22/2015 | 5/22/2015 3:54:08 PM | P | PART |
|
|
Framing ; Air Seal Phone #: ###-#### Inspection requested via web by Michael Eisenbeiss. Need gerder nailing and engineered fix for cut foor joist
|
BLD14-03219
| BLD-Wall Bracing | 5/22/2015 | 5/22/2015 | 5/22/2015 3:52:36 PM | P | FAIL |
|
|
Framing ; Air Seal Phone #: ###-#### Inspection requested via web by Michael Eisenbeiss. Need to renail shear walls
|
BLD15-00655
| BLD-Foundation | 5/22/2015 | 5/22/2015 | 5/22/2015 2:27:05 PM | P | PASS |
|
|
Juan-pour time 3:00 Phone #: ###-####
|
BLD15-00578
| BLD-Foundation | 5/21/2015 | 5/22/2015 | 5/22/2015 2:02:48 PM | P | PASS |
|
|
Scott Phone #: ###-#### Slab
|
BLD14-03300
| BLD-Foundation | 5/22/2015 | 5/22/2015 | 5/22/2015 1:48:10 PM | P | PASS |
|
|
Rocko-stem wall Phone #: ###-####
|
BLD15-00329
| BLD-Foundation | 5/21/2015 | 5/22/2015 | 5/22/2015 1:22:47 PM | P | CANC |
|
|
CMU grout is scheduled for 1:00 pm. Thanks. Phone #: ###-#### Inspection requested via web by Tony Inserra
|
BLD15-00128
| BLD-Foundation | 5/22/2015 | 5/22/2015 | 5/22/2015 1:20:35 PM | P | DEFR |
|
|
|
BLD15-00591
| BLD-Framing/Rough-in | 5/21/2015 | 5/22/2015 | 5/22/2015 12:11:39 PM | A | PASS |
|
|
Plans on site Inspection requested via web by Erby Gonzales
|
BLD15-01015
| BLD-Wall Bracing | 5/21/2015 | 5/22/2015 | 5/22/2015 11:32:41 AM | A | PASS |
|
|
Shear inspection, plans on site Inspection requested via web by Erby Gonzales
|
BLD15-00863
| BLD-Energy code compliance | 5/21/2015 | 5/22/2015 | 5/22/2015 11:20:49 AM | A | NR |
|
|
Inspection requested via web by Erby Gonzales
|
BLD15-01065
| BLD-Foundation | 5/21/2015 | 5/22/2015 | 5/22/2015 10:59:01 AM | A | PASS |
|
|
Doug Phone #: ###-####
|
BLD15-00670
| BLD-Wall Bracing | 5/20/2015 | 5/22/2015 | 5/22/2015 10:47:08 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner Missing one hold down at the door to the garage.
|
BLD15-00814
| BLD-Footing | 5/21/2015 | 5/22/2015 | 5/22/2015 9:47:07 AM | A | PART |
|
|
Barro Phone #: ###-#### Poor at 11:00. West half of south wall.
|
BLD14-03300
| BLD-Foundation | 5/21/2015 | 5/22/2015 | 5/22/2015 8:56:29 AM | A | NR |
|
|
Rocko-stem wall Phone #: ###-####
|
BLD15-00766
| BLD-Wall Bracing | 5/21/2015 | 5/22/2015 | 5/22/2015 8:29:49 AM | A | CANC |
|
|
Shear inspection, plans on site >> Inspection requested via web by Erby Gonzales Inspection cancelled from web by: Erby Gonzales
|