Inspections for the day of: Friday, May 22, 2015.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPhil Shearer
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-00442 BLD-Energy code compliance5/22/20155/22/20155/22/2015 4:37:22 PMPPASS
###-#### Inspection requested via web by Erby Gonzales
BLD15-00766 BLD-Wall Bracing5/22/20155/22/20155/22/2015 4:31:45 PMPFAIL
Shear inspection, rescheduled for PM. Plans on site Inspection requested via web by Erby Gonzales. replace sheeting on portal framethe nails are over shot. All s1 shear panels need to have 8D at 6" and 12" or staples at 3" and 6" CN posted
BLD14-03219 BLD-Framing/Rough-in5/21/20155/22/20155/22/2015 3:54:08 PMPPART
Framing ; Air Seal Phone #: ###-#### Inspection requested via web by Michael Eisenbeiss. Need gerder nailing and engineered fix for cut foor joist
BLD14-03219 BLD-Wall Bracing5/22/20155/22/20155/22/2015 3:52:36 PMPFAIL
Framing ; Air Seal Phone #: ###-#### Inspection requested via web by Michael Eisenbeiss. Need to renail shear walls
BLD15-00655 BLD-Foundation5/22/20155/22/20155/22/2015 2:27:05 PMPPASS
Juan-pour time 3:00 Phone #: ###-####
BLD15-00578 BLD-Foundation5/21/20155/22/20155/22/2015 2:02:48 PMPPASS
Scott Phone #: ###-#### Slab
BLD14-03300 BLD-Foundation5/22/20155/22/20155/22/2015 1:48:10 PMPPASS
Rocko-stem wall Phone #: ###-####
BLD15-00329 BLD-Foundation5/21/20155/22/20155/22/2015 1:22:47 PMPCANC
CMU grout is scheduled for 1:00 pm. Thanks. Phone #: ###-#### Inspection requested via web by Tony Inserra
BLD15-00128 BLD-Foundation5/22/20155/22/20155/22/2015 1:20:35 PMPDEFR
BLD15-00591 BLD-Framing/Rough-in5/21/20155/22/20155/22/2015 12:11:39 PMAPASS
Plans on site Inspection requested via web by Erby Gonzales
BLD15-01015 BLD-Wall Bracing5/21/20155/22/20155/22/2015 11:32:41 AMAPASS
Shear inspection, plans on site Inspection requested via web by Erby Gonzales
BLD15-00863 BLD-Energy code compliance5/21/20155/22/20155/22/2015 11:20:49 AMANR
Inspection requested via web by Erby Gonzales
BLD15-01065 BLD-Foundation5/21/20155/22/20155/22/2015 10:59:01 AMAPASS
Doug Phone #: ###-####
BLD15-00670 BLD-Wall Bracing5/20/20155/22/20155/22/2015 10:47:08 AMAPART
Phone #: ###-#### Inspection requested via web by Weston Wagner Missing one hold down at the door to the garage.
BLD15-00814 BLD-Footing5/21/20155/22/20155/22/2015 9:47:07 AMAPART
Barro Phone #: ###-#### Poor at 11:00. West half of south wall.
BLD14-03300 BLD-Foundation5/21/20155/22/20155/22/2015 8:56:29 AMANR
Rocko-stem wall Phone #: ###-####
BLD15-00766 BLD-Wall Bracing5/21/20155/22/20155/22/2015 8:29:49 AMACANC
Shear inspection, plans on site >> Inspection requested via web by Erby Gonzales Inspection cancelled from web by: Erby Gonzales