PLM02-01326
| Water and/or Sewer | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-01433
| Water and/or Sewer | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | FAIL |
|
|
###-#### drain,s waste and vent,s failed 5/23/2002 1:05:38 PM
|
PLM02-01481
| Sprinkler (Final) | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | PART |
|
|
mike ###-#### backflow need to be tested and certified ok to cover tie -in 5/23/2002 1:37:14 PM
|
PLM02-00506
| Final | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | NH |
|
|
BEN ###-#### no access 5/23/2002 11:00:50 AM
|
PLM02-00919
| Final | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 14:01:28. Contact: ###-####.
|
PLM02-01489
| Water and/or Sewer | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | PASS |
|
|
###-#### water line installed at 2016 owner lives at 2020 curtis next door water line test ok -okto cover 5/23/2002 10:15:55 AM
|
PLM02-01455
| Plumbing Rough-in | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 07:20:35. Contact: ###-####.
|
PLM02-00793
| Final | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 08:13:20. Contact: ###-####. need hose bibb vacuum breaker on hose connection for mixing valve in garage called contractor will recall when corrected 5/23/2002 3:28:32 PM
|
PLM02-01418
| Water and/or Sewer | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 08:15:26. Contact: ###-####.
|
PLM02-01491
| Water and/or Sewer | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-01081
| Final | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 08:46:18. Contact: ###-####.
|
PLM02-00266
| Final | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 09:15:50. Contact: ###-####.
|
PLM02-01298
| Groundwork | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 10:01:56. Contact: ###-####. ground work in building on south-east corner of lot test ok water stub-in but sewer is not stub to outside of northeast corner of building yet note- ground-work for 1 toilet 1lav and 1 floor drain with trap-primer 5/23/2002 2:29:27 PM
|
PLM02-01481
| Sprinkler (Final) | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-01275
| Water and/or Sewer | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 5/23/2002 1:07:59 PM
|