BLD01-02190
| BLD-Final | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 10:11:50. Contact: ###-####. Cancelled by contractor -re-schedule to pm. 5/23/2002 10:57:53 AM
|
MEC02-00784
| Final | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 10:47:14. Contact: ###-####. access code 10956
|
BLD01-03225
| BLD-Framing/Rough-in | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | FAIL |
|
|
roof nailing insp nick -###-#### SHEAR--C/N posted in job trailer. 5/23/2002 9:59:11 AM
|
BLD02-00609
| BLD-Framing/Rough-in | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-00609
| BLD-Energy code compliance | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-01081
| BLD-Foundation | 5/22/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | PART |
|
|
JARED ###-#### wip 5/23/2002 11:27:21 AM
|
MIS02-00128
| BLD-Final | 5/20/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | DONE |
|
|
M. MALIA HALL ###-#### **Please make a note for the inspector to leave the inspection with the homeowner or drop off at 1025 S Capitol Blvd.
|
BLD02-00614
| BLD-Framing/Rough-in | 5/21/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | A | FAIL |
|
|
###-#### or ###-#### C/N posted 5/23/2002 9:28:34 AM
|
BLD02-00750
| BLD-Framing/Rough-in | 5/21/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PART |
|
|
shear wall \\###-#### C/N posted --Ext. shear ok--cripple walls need to be 2" X 6" to comply with 97 UBC 2320.11.5 (at least the same size as the stud above) and cripple walls exceeds 14" in height--wall bracing required--Check at framing. 5/23/2002 2:47:51 PM
|
BLD02-01048
| BLD-Footing | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PART |
|
|
MANA ###-#### wip--85% ready 5/23/2002 2:36:19 PM
|
BLD02-00948
| BLD-Foundation | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PART |
|
|
###-#### jerry found wip 5/23/2002 3:30:39 PM
|
BLD01-02190
| BLD-Final | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 420 On 5/23/2002 10:57:19 AM Contractor needs all signatures on occupancy card. 5/23/2002 1:31:35 PM
|
BLD02-00723
| BLD-Framing/Rough-in | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | PART |
|
|
JOHN ###-#### c/n--ok to insulate 5/23/2002 3:30:29 PM
|
BLD01-03038
| BLD-Energy code compliance | 5/23/2002 | 5/23/2002 | 5/23/2002 12:00:00 AM | P | DONE |
|
|
JOHN ###-####
|